Back to Outdoors

How to Lay Decking Boards

How to Lay Decking Boards
DIY Guides Editorial 1 August 2026

Boarding is the quick and satisfying part of a deck, and it is also where a small error at the start becomes a very visible one by the far edge.

Before the first board

Check the frame is square by measuring both diagonals, and check the fall with a level and straight edge.

Confirm every joist is at the right spacing and that noggins are in.

Let the boards acclimatise. Stack them flat, with spacers between, in the place they will be used, for a few days. Timber laid straight off a wet pallet shrinks after fixing and the gaps open up unevenly.

Sort through the pack and set aside anything badly bowed or with a large knot near an end. Use the worst boards where they will be cut short or hidden.

Which way up

Many softwood boards have a grooved face and a smooth or reeded face.

The grooves are not there for grip and do not make a deck less slippery. Their practical effect is to hold water and dirt, and algae grows in them readily.

Most people lay the smooth face up, which is easier to clean and easier to sand later. Either way, be consistent across the whole deck.

Lay boards with the growth rings curving downwards where you can see them, so any cupping sheds water rather than holding it.

Where to start

Start at the house and work outwards, so any cut board lands at the outer edge where it is least noticeable and easiest to scribe.

Leave a gap of around 10mm between the first board and the wall, so water drains and timber can move without pushing against the building.

Get the first board absolutely straight, checked against a string line rather than against the wall, which is rarely straight itself. Every subsequent board follows it.

Board gaps

Gaps let water drain and allow the timber to move.

For softwood, 5mm to 8mm is usual, with the smaller figure where boards are wet on delivery since they will shrink, and the larger where they are dry since they may swell.

For composite, follow the manufacturer's figure exactly, both between boards and at the ends, since composite moves lengthways with temperature far more than timber does.

Use spacers rather than eyeing it. Cut offcuts to the gap width, or use proprietary spacers, and use the same ones all the way across.

Check the run every few boards by measuring from the wall at both ends. A gap that drifts by 2mm per board is 100mm out by the far side.

Joints and board ends

Stagger butt joints across the deck rather than lining them up, ideally so no two adjacent rows join on the same joist.

Every board end needs to sit on a joist with full bearing. Double the joist at joint positions so each end has its own support and its own fixings.

Leave a small gap between butted board ends for movement, and seal the cut ends with preservative before fixing.

Fixing

Two screws per board per joist, set in around 20mm from the edge.

Pilot drill hardwood always and softwood near the ends.

Drive screws flush, not proud and not buried.

Where boards are bowed, pull them straight with a clamp or a pair of chisels levered against the joist before fixing.

The last board

The final board is almost never a full width, and this is where planning pays off.

Measure the remaining gap at several points before cutting, since the frame may not be perfectly parallel.

Where the last board would be a narrow sliver, take a little off the first board instead and split the difference, which looks far better.

Rip the board with a circular saw against a straight edge rather than freehand, and treat the cut edge.

Finishing the edges

Trim all the board ends in one pass with a circular saw run along a clamped straight edge, rather than cutting each board to length individually. The line will be far cleaner.

Treat every cut end and edge with preservative as the last job before any fascia goes on.

Fit a fascia or edge trim if wanted, leaving ventilation gaps rather than sealing the void.

Sweep the deck and remove every offcut and screw before anyone walks on it barefoot.