Paths fail in a particular way: people walk beside them. That happens when the route was drawn rather than observed, and it is avoidable at the planning stage.
Follow the desire line
Watch where people actually walk before deciding anything.
Worn patches in a lawn are the route the path should take, and fighting them produces a path nobody uses.
A curve is fine where the ground or a planting bed justifies it. A curve for its own sake gets cut across the inside of every bend.
Mark the route with a hose or sand and leave it a week, walking it in the dark and with full hands.
Width
Paths are routinely built too narrow.
A single person needs around 750mm, which feels tight.
900mm is a comfortable minimum for a main path.
1200mm lets two people walk side by side and is generous.
Allow for a wheelbarrow, a mower and a wheelie bin on any route that serves the shed, the garage or the bins.
Where planting will spill over the edges, add width for it or accept the path narrows by mid summer.
Choosing the surface
Match the surface to the traffic and the setting.
Paving slabs are firm, level, and the best choice for a main route and for wheeled access.
Block paving follows curves easily and handles heavier use.
Gravel is cheap and permeable and needs edging, and it is hard work with a wheelbarrow.
Bark and woodchip suit informal and woodland paths, cost very little and need topping up.
Stepping stones suit a route through planting or lawn where a full path would dominate.
Concrete is durable, practical and unloved, and it works well hidden behind planting.
Gradients and steps
A path steeper than about 1 in 12 becomes awkward, and anything approaching 1 in 8 is difficult with a barrow.
Where the ground is steeper, either lengthen the route to reduce the gradient or introduce steps.
Do not mix a gentle slope with a single isolated step, which is exactly where people trip.
Where wheeled access matters, keep the whole route as a ramp and avoid steps altogether.
Drainage
A path collects and channels water, so decide where that water goes.
Build a slight crossfall, around 1 in 60 to 1 in 80, to one side rather than laying it dead level.
Never fall a path towards the house.
Where the path runs along a wall, fall it away and keep the surface at least 150mm below the damp proof course.
At the bottom of a slope, water arrives in volume, so a channel or a gravel interceptor is worth including.
Levels against the house and lawn
Set the path level against a lawn slightly below the turf, by around 20mm, so a mower runs over the edge without catching.
Against a border, a mowing strip or a kerb stops soil washing onto the path.
Against the house, the damp proof course governs everything.
Edges and restraint
Every path needs restraint, since the sub-base spreads sideways without it.
Rigid edging in concrete for slabs and blocks; timber, steel or plastic edging for gravel and bark.
For gravel and bark the edge should stand proud of the surface, to contain it. For slabs it sits flush.
Lighting and safety
Think about the route in the dark, particularly at steps and changes of level.
Low level or recessed lighting at step nosings makes a real difference.
Any mains electrical work outdoors is notifiable under the building regulations and needs a registered electrician, so solar or low voltage lighting is the simpler route.
Run any cable or duct while the path is being built rather than digging it up later.
What to check before starting
Locate drains, inspection chambers and buried services along the route.
An inspection chamber under a path must stay accessible, so plan a recessed cover or route around it.
Check for tree roots, and route around significant trees rather than cutting through the root zone.
Work out how materials will be delivered and barrowed, and where spoil will go.