Almost nobody knows where the water off their roof ends up, and it becomes important the moment you pave a garden, add an extension or fit a new downpipe.
The three possibilities
A surface water sewer, a separate public drain taking only rainwater, which usually discharges to a watercourse.
A combined sewer, an older system carrying both foul waste and rainwater to treatment. Common in Victorian and early twentieth century areas.
A soakaway, a pit or crate system on your own land where water infiltrates into the ground. Standard on newer estates and in rural properties.
A property may use more than one. The front downpipes might run to a sewer and the rear ones to a soakaway.
Why it matters
Paving or building anything adds to the volume the existing system has to take.
Connecting rainwater into a foul only drain is not permitted and causes problems at the treatment works and, in heavy rain, sewage backing up.
Adding to a soakaway that is already at capacity produces a waterlogged garden.
Discharging onto a neighbour's land or into the highway is not acceptable and can lead to action against you.
When you sell, a buyer's solicitor may ask, and drainage searches sometimes flag unexplained connections.
Tracing it yourself
Start at each downpipe and follow it down.
Where it enters an open gully, a grated or hopper fitting at ground level, lift the grate and look. A gully is usually a trapped connection into a drain run.
Where it disappears into a sealed connection at ground level, it goes straight into a pipe.
Where it runs into a pipe that heads away from the house into the garden and stops, it is going to a soakaway.
Note every downpipe and where it goes, and sketch it.
The bucket test
Pour a bucket of water down a downpipe or into a gully and listen at each nearby inspection chamber.
Lift the covers first. Water arriving in a chamber tells you the route, and doing this for each downpipe in turn builds up the picture.
A dye tablet from a merchant makes it far easier to follow where water surfaces.
Never put dye into a drain you believe reaches a watercourse without checking, since it can cause alarm downstream.
Reading an inspection chamber
Lift a cover carefully and look at what is inside.
A chamber with a smooth open channel and branches entering it is a drainage run.
Clean, clear water running through suggests surface water. Discoloured water and paper suggests foul or combined.
Note the direction of flow and the number of inlets.
Replace covers properly and keep children away while they are off.
Asking rather than guessing
The water and sewerage company holds records of public sewers and will supply a plan, and a drainage and water search is a standard conveyancing document you may already have.
The local authority building control department holds records of approvals for newer work, including soakaway details.
For a house built in the last few decades, the original approved drainage drawing frequently exists and shows everything.
Surface water drainage hierarchy
Where new drainage is being designed, the accepted order of preference is to discharge into the ground first, then to a watercourse, and only then to a sewer.
That is why soakaways are the default on new work and why simply adding another connection to the public sewer is not usually acceptable.
What you must not do
Connect rainwater into a foul drain.
Connect foul waste into a surface water drain, which is a pollution offence.
Build over or close to a public sewer without agreement from the sewerage undertaker.
Discharge water onto a highway or a neighbouring property.
Block, cover or make inaccessible an inspection chamber, which has to remain reachable.
Before any paving or building work
Work out the existing arrangement, then work out what your project adds.
Plan where the extra water will go before you start, rather than discovering the problem in the first heavy autumn rain.
Where a soakaway is involved, test the ground before relying on it.