Both work, and both are used by trades. The choice comes down to how many posts you are setting, how much time you have, and whether you want working time or speed.
What postcrete actually is
A dry blend of cement and aggregate designed to be poured straight into water in the hole, with no mixing.
Water goes in first, the bag goes in after, and the mix sets within minutes rather than hours. Most brands allow light handling in around ten minutes and take load within a few hours.
The speed comes from the formulation, not from being stronger. Postcrete reaches a perfectly adequate strength for fencing, but it is not a structural concrete.
The case for postcrete
No mixing, no mixer, no ballast to shift. For one or two posts this is decisive.
The post can be released from bracing quickly, which matters when working alone.
Bags are consistent, so the mix is right every time without judgement.
It is the obvious choice for a repair, a single gate post, or a job done in a couple of hours between showers.
The case for mixed concrete
Cost. On a long run the difference is substantial. Ballast and cement bought separately work out considerably cheaper per post than bagged postcrete.
Working time. Ordinary concrete gives an hour or more to adjust, check and plumb posts, which is useful when setting a whole line at once.
Control. You can adjust the mix, and you can compact it properly in layers.
For a fence of ten posts or more, mixing is usually worth the effort and a hired mixer makes it straightforward.
Mix proportions
A general purpose fence post mix is around one part cement to five parts all in ballast, mixed to a stiff consistency rather than a sloppy one.
Too much water weakens the concrete and causes shrinkage cracking. The mix should hold its shape when heaped, not flow.
Compact each layer in the hole with a bar to drive out voids.
How much per post
A typical 300mm diameter hole 600mm deep takes roughly 40 litres of set material, less the volume of the post.
That works out at around two bags of postcrete for a standard post hole, and rather more for a gate post.
Buy more than you calculate. Running out halfway through a hole means a cold joint in the middle of the block, and it is the most annoying way to lose a Saturday.
Using postcrete correctly
Put the recommended volume of water in the hole first, then add the compound. Doing it the other way round leaves dry pockets.
Follow the water quantity on the bag rather than guessing, since too little leaves the mix unhydrated and weak.
Have the post braced and plumb before you start, because there is no time to correct anything afterwards.
Work one post at a time. Postcrete does not wait.
Weather
Neither material should be used in frost or when frost is forecast overnight, since freezing water in a fresh mix destroys its strength.
Both slow considerably in cold weather. Setting times printed on a bag assume mild conditions.
In very hot, dry weather the reverse applies and the working time shortens.
Handling and safety
Cement based products are alkaline and cause burns on prolonged skin contact, which develop slowly and are easily missed until the damage is done.
Wear gloves, eye protection and long sleeves, and wash any splashes off immediately. Kneeling in wet concrete through trousers is a common cause of cement burns.
Dry powder is a dust hazard. Open bags low in the hole and avoid pouring from height on a windy day.
A reasonable rule
Up to about four posts, or any repair, use postcrete and accept the cost.
Beyond that, or where you want time to line up a whole run, mix concrete.
Either way the drainage layer under the post and the sloped finish above ground matter more to the fence's lifespan than which product went in the hole.