Gravel is the most forgiving hard surface to lay and the easiest to get wrong in one specific way: far too deep, with an aggregate that rolls underfoot.
Why gravel is worth considering
It is inexpensive and needs no cutting, mortar or specialist tools.
It is permeable, which matters in a front garden where impermeable surfaces over five square metres need planning permission.
It follows irregular shapes and levels easily.
It is noisy underfoot, which many people like for security.
It can be lifted and reused, and it is straightforward to alter later.
The build up
The construction is similar to a slab patio, minus the bedding layer.
Excavate to around 150mm below the finished level for a path or patio, more if vehicles are involved.
Remove all topsoil and organic material and dig to firm subsoil.
Lay a geotextile membrane on the formation, which stops the sub-base being pushed into the subsoil.
Add 100mm of compacted MOT Type 1, in two layers with a plate compactor.
Lay a second weed control membrane over the compacted sub-base.
Finish with the gravel.
Depth is where people go wrong
Gravel should be no more than about 50mm deep, and 30mm to 40mm is better for walking on.
Deeper gravel does not look more generous, it simply moves. Anything much over 50mm shifts underfoot, feels unstable, and is unpleasant to walk on or push a wheelbarrow across.
It also migrates to the edges and leaves the middle thin.
The instinct to order more than you need is the single most common gravel mistake.
Choosing the aggregate
Angular gravel locks together and stays put. Crushed granite, slate chippings and angular limestone all bind reasonably well underfoot.
Rounded pea shingle rolls. It looks attractive in a border and is genuinely difficult to walk on, and it migrates constantly.
Size matters. 10mm to 20mm is the usual range. Smaller than 10mm gets carried indoors on shoes and in pet paws; larger than 20mm is uncomfortable underfoot.
Self binding gravel and hoggin contain fines that compact into a firm surface, which suits paths and is much easier to walk on, though it is less free draining.
Edging
Gravel goes wherever it is allowed to, so the edge does the work.
Use timber edging, metal edging, block kerbs or a haunched edging course, set before the gravel goes down.
The edge should stand slightly proud of the finished gravel level, by around 20mm, so the gravel is contained rather than level with the top.
Where gravel meets a lawn, a mowing edge saves considerable irritation.
Where it meets a doorway, a hard threshold strip stops gravel being kicked inside.
Stabilising grids
Plastic honeycomb grids filled with gravel hold it in place and are worth the cost on any slope, on a drive, or anywhere a wheelchair or pushchair is used.
They allow a shallower gravel layer, spread load, and stop the surface rutting.
They sit on the compacted sub-base and are filled flush plus a thin top dressing.
On any slope steeper than about 1 in 20, loose gravel will not stay put and a grid is effectively necessary.
Weeds
Membrane underneath stops weeds coming up from below, which is most of the problem.
Seed blows in and germinates in the gravel itself, which no membrane prevents.
Hoeing and hand weeding a couple of times a season keeps it under control.
Raking occasionally redistributes the gravel and disturbs seedlings before they establish.
Practical points
Calculate quantity from the area and the depth, remembering that gravel is usually sold by weight. Around 1.5 tonnes covers 20 square metres at 50mm.
Order a little extra for topping up in a year or two, and note the exact product name, since colours vary between quarries and batches.
Have the delivery tipped somewhere you can barrow from without crossing a lawn.
Rake it level rather than compacting it, since gravel is meant to stay loose.