A concrete base is a weekend job with a hard deadline in the middle of it, because once concrete is mixed it cannot wait. Preparation is everything.
Setting out
Mark the slab size, which should match the shed floor or be very slightly smaller.
Set out square using the 3 4 5 method: measure 3 metres along one line, 4 along the other, and adjust until the diagonal is exactly 5 metres.
Check both diagonals of the finished rectangle, which should be identical.
Check for buried services before digging, particularly on any line between the house and a garage or an outside tap.
Excavation
Dig out to around 200mm below the finished slab level for a typical shed.
That allows 100mm of compacted sub-base and 100mm of concrete.
Remove all turf, topsoil and organic material, and dig to firm undisturbed subsoil.
Dig 100mm or so wider than the slab on each side so the formwork can be set and braced.
Sub-base
Lay and compact 100mm of MOT Type 1, in two layers, using a hired plate compactor.
Compact each layer in several directions until the surface rings solid and shows no footprints.
Slightly damp material compacts far better than dry.
On soft or clay ground, lay a geotextile membrane on the formation first.
Formwork
Build a frame from timber, commonly 100mm by 25mm or 150mm by 25mm, set to the finished slab level.
Fix it to stakes driven outside the slab area, with a stake every 600mm or so, and check the top edge is level all round.
The top of the formwork is what you screed to, so time spent levelling it now saves a great deal of correction later.
Brace the corners, since wet concrete pushes outwards with real force.
Oil or wet the inside face so the timber releases cleanly.
How much concrete
Multiply length by width by depth in metres to get cubic metres.
A 3 by 2 metre slab at 100mm is 0.6 cubic metres.
That is roughly 1.4 tonnes of material, or around 20 bags of mixed ballast plus cement, which is more than most people expect.
Above about half a cubic metre, ready mixed concrete is worth considering, and above one cubic metre it is usually the sensible choice. Mixing that volume by hand is a genuinely hard day.
Order slightly more than you calculate, since running out mid pour leaves a cold joint.
The mix
A general slab mix is around 1 part cement to 2 parts sharp sand to 3 parts aggregate, or 1 to 5 all in ballast.
Mix to a workable consistency that holds its shape, not sloppy. Excess water weakens concrete and causes shrinkage cracks.
A hired mixer is worth the cost for anything beyond a very small slab.
Reinforcement
A light steel mesh laid in the middle of the slab depth reduces cracking and is worth including on anything over a couple of square metres.
Support it on spacers so it sits within the concrete rather than resting on the sub-base.
Keep it at least 40mm in from every edge.
Pouring and finishing
Work from one end to the other and keep going, filling in layers and compacting with a rake or a bar to drive out air pockets.
Pay particular attention to the corners and the edges against the formwork.
Screed off using a straight timber worked across the top of the formwork in a sawing motion.
Fill any low spots and screed again.
Float the surface once the sheen has gone. A slightly textured finish is better than a polished one, which will be slippery when wet.
Curing
Cover with polythene or damp hessian and keep it covered for several days.
Concrete cures by chemical reaction rather than drying out, and letting it dry too fast causes cracking and a weak surface.
Do not pour in frost or when frost is forecast overnight.
Leave at least a few days before standing the shed on it, and longer in cold weather.
Strike the formwork after a day or two and backfill around the edges.