Insulating a shed turns it from a storage box into a usable space, and the common mistake is treating it as a simple matter of stuffing material into the walls.
Is it worth it
Worth doing for a workshop, a home office, a gym or anywhere you will spend time.
Worth doing on a metal shed purely to control condensation.
Not usually worth it for general storage, where ventilation alone solves most problems.
Before insulating, make sure the building is sound, dry and properly ventilated. Insulating a leaky shed hides the leak rather than fixing it.
Insulation options
Rigid PIR or polyiso board gives the best performance for its thickness and is easy to cut and friction fit between the frame. It is the usual choice where the frame depth is limited.
Mineral wool is cheaper, handles irregular gaps well and is good for sound. It must be kept dry, since wet mineral wool insulates nothing.
Multifoil and bubble foil are thin and easy to fit and perform far less well than the packaging implies. Useful where thickness is critical, and not a substitute for board.
Sheep wool and natural fibres handle moisture better and cost more.
Match the thickness to the frame depth rather than compressing material in, since compressed insulation loses most of its value.
The vapour barrier
This is the part most often got wrong and the part that causes hidden damage.
Warm air inside carries moisture. If it reaches a cold surface within the wall, it condenses there, inside the construction where you cannot see it.
The vapour control layer goes on the warm side, which is the inside, between the insulation and the internal lining.
Use a proper vapour control membrane and tape the joints and edges.
Getting this backwards, or leaving it out, means moisture accumulating in the insulation and rotting the frame from inside.
Ventilation still matters
Insulating without ventilating moves the problem rather than solving it.
Keep vents at high and low level so air moves through the room.
Leave a ventilated gap behind the insulation where the cladding is not breathable, so any moisture that does get in can dry out.
Do not block the airflow under the floor.
Lining
Plywood at 9mm or 12mm is the most useful lining, since you can fix shelves and brackets anywhere.
OSB is cheaper and rougher and works well in a workshop.
Plasterboard is possible but fragile in a shed and does not like damp.
Tongue and groove boarding looks good and takes fixings well.
Fix the lining to the frame, not through the insulation, and leave a small gap at floor level.
Floor and roof
Heat is lost through both, and the floor is uncomfortable in winter if left bare.
Rigid board between the floor bearers, with a board finish over, works well and can be done from above when the shed is empty.
For the roof, insulate between the rafters, leaving a ventilation gap above the insulation where the covering is not breathable.
Do not pack insulation tight against the underside of the roof boards without that gap.
Windows and doors
Single glazed styrene loses a great deal of heat and is where condensation shows first.
Secondary glazing with a sheet of acrylic fixed inside the frame makes a noticeable difference cheaply.
Draughtproof the door with compression seals and fit a threshold seal, which is frequently the largest single air leak.
Heating and power
Any mains electrical work in an outbuilding is notifiable under the building regulations and must be done by a registered electrician or notified to building control. This includes running a supply from the house.
Do not run an extension lead permanently from the house as a substitute.
Use heaters designed for the space, with a thermostat, and never leave a portable heater unattended in a building full of timber, fuel and paint.
A small oil filled radiator on a frost setting keeps a workshop above condensation point cheaply.