A bathroom is the most heavily serviced room in a house, and the position of the drainage constrains the layout more than any design preference.
Start with the soil pipe
The toilet is the hardest fitting to move, because it needs a large-diameter waste with a consistent fall to the soil stack.
A 100mm soil pipe needs a fall of around 1 in 40, so moving a toilet even a couple of metres uses a significant amount of height, which frequently is not available under a floor.
Basins, baths and showers use smaller waste pipes and are far easier to relocate.
Plan the toilet position first and arrange everything else around it.
Where a toilet genuinely cannot reach a gravity drain, a macerator is an option, and guidance expects a dwelling to retain at least one WC discharging by gravity.
Clearances
These determine whether a bathroom is usable rather than merely full.
In front of a toilet: around 600mm of clear space, and 700mm is better.
Either side of a toilet: at least 200mm from the centre line to a wall or fitting.
In front of a basin: around 700mm, so you can stand and lean forward.
In front of a bath: around 700mm to get in and out and to dry.
Shower enclosure: allow space for the door to swing, or use a sliding or bi-fold door in a tight room.
Doors are frequently the problem. Check the door swing against every fitting, and consider rehanging it to open outwards or fitting a sliding door.
Standard sizes
Baths are commonly 1700 by 700mm, with 1500 and 1800 also available.
Shower trays run from 760mm square upwards. 800 by 800mm is a realistic minimum for comfort, and 900 or a rectangular tray is considerably better.
Basins vary enormously, and a compact basin in a small room is a false economy if you cannot wash without soaking the floor.
Electrical zones
These are set by the wiring regulations and restrict what may be installed where.
Zone 0 is inside the bath or shower tray itself, where only very low voltage equipment rated for immersion is permitted.
Zone 1 is above the bath or tray to 2.25m, where equipment needs an appropriate ingress protection rating.
Zone 2 extends 0.6m beyond zone 1, with similar requirements.
Socket outlets are not permitted within 3m of the zone 1 boundary, other than shaver supply units to the relevant standard.
All circuits in a bathroom require RCD protection.
Electrical work in a bathroom is notifiable under the building regulations in England and Wales, so it needs a registered electrician or a building control application.
Plan light, fan, shower and heated towel rail positions with these zones in mind, before anything is bought.
Ventilation
Required under the building regulations, and the usual figure for a bathroom is 15 litres per second of intermittent extract.
Where there is no openable window, an overrun timer is normally required.
Plan the duct route to an outside wall at the design stage, since retrofitting one is awkward.
Water pressure
Check what system you have before choosing taps and showers.
A combi boiler or unvented cylinder gives mains pressure, and pumps must not be fitted to these.
A gravity-fed system from a loft tank gives low pressure, which many mixer showers and taps will not work on without a pump.
Check the minimum pressure figure for every item before ordering.
Draw it and tape it out
Measure the room precisely, including window reveals, pipe boxing and the door swing.
Draw it to scale and mark the soil stack, waste runs, water supply and the electrical zones.
Then mark the fittings on the floor with tape and move around the room. A layout that works on paper can be unusable in reality.
Small bathrooms
A wall-hung basin and toilet free up floor space visually and make cleaning easier, and both need a concealed frame or a solid fixing.
A shower over the bath saves the space a separate enclosure would take.
A sliding or outward-opening door releases a surprising amount of usable room.
Consider a smaller bath at 1500mm rather than losing it altogether, since a house with no bath can be harder to sell.