Back to Projects

Tiling a Bathroom Wall

Tiling a Bathroom Wall
DIY Guides Editorial 10 December 2025

Tiling is a slow, methodical job rather than a difficult one, and almost everything that makes a tiled wall look right or wrong is decided before the first tile goes up.

Prepare the wall

The wall must be flat, sound, dry, clean and rigid.

Fill holes and let the filler dry. Sand off any high spots.

Prime absorbent surfaces such as new plaster or plasterboard with a tile primer, so the adhesive does not dry out too quickly.

Tank any area that will get wet before tiling, since tiles and grout are not waterproof.

Remove wallpaper entirely. Never tile over it.

Tiling over existing tiles is possible on a sound, well-fixed surface, and adds weight and thickness, and is best avoided where the substrate is unknown.

Setting out

This is the part that matters.

Find the centre of the wall and mark a vertical line.

Dry lay tiles along the floor with spacers to see where the cuts fall.

Adjust the starting point so the cut tiles at each end are equal and as wide as possible. Avoid ending with a narrow sliver, which looks poor and is difficult to cut.

Where there is a focal point such as a window, a shower or a basin, centre on that rather than on the wall.

Plan the vertical setting out too, so you do not end with a thin cut at the ceiling or an awkward cut at the bath.

Use a batten

The single most useful technique.

Floors and baths are rarely level, and tiles laid to follow them run out of true.

Fix a straight timber batten horizontally at the level of the bottom of the second row, checked with a spirit level, and start tiling from there.

This gives a guaranteed level base and means the bottom row of cut tiles is fitted last, scribed to the floor or the bath.

Fix a vertical batten at the setting-out line too, if it helps.

Remove the battens once the adhesive has set and fill the holes.

Adhesive

Use a cement-based adhesive in wet areas and for anything heavy or large format.

Ready-mixed adhesive is convenient for a small splashback on a dry wall and is not suitable for a shower.

Apply with a notched trowel and comb it into ridges, covering an area you can tile before it skins over.

Press each tile firmly with a slight twist so the ridges collapse and the tile beds properly.

Check coverage by lifting a tile occasionally, particularly in a shower. In wet areas the aim is full coverage behind the tile with no voids, which may mean back-buttering each tile.

Spacing and checking

Use spacers consistently.

Check level and plumb every few tiles, and check the face is flat with a straight edge.

Clean adhesive out of the joints as you go, since it is far harder once set.

Wipe adhesive off tile faces immediately.

Cutting

A manual cutter handles straight cuts in ceramic quickly.

Porcelain is harder and generally needs a wet cutter.

Use a tile hole cutter or a diamond hole saw for pipes, and a tile file to ease the edge.

For an L-shaped cut round a socket or a corner, use a cutter for the straight and nibblers or a wet saw for the rest.

Wear eye protection, and use water suppression with a diamond blade, since the dust contains silica.

Grouting

Wait for the adhesive to set fully, usually 24 hours.

Use a grout suited to the joint width and to a wet environment.

Work it into the joints diagonally with a grout float, filling completely.

Remove the excess before it hardens, then shape the joints with a finger or a tool.

Polish off the haze with a dry cloth once dry.

Where not to grout

Use flexible sanitary silicone, not grout, at every internal corner, and at the junction with the bath, tray, worktop or floor.

These joints move, and grout cracks out of them within months.

Use a silicone containing a fungicide, on clean dry surfaces, and tool the bead immediately.

Tiling around obstacles

Plan the setting out so that sockets, switches and shower valves fall sensibly rather than across a joint.

Cut around a shower valve with a hole cutter before fitting the trim, which then covers the cut edge.

Tile behind a heated towel rail before it is fitted, since tiling around it afterwards is impossible.