The conveyancing process asks specific questions about work done to a property. Assembling the answers before going on the market saves weeks of delay.
What you will be asked for
The property information form asks about alterations, and the buyer's solicitor follows up on anything disclosed.
The documents typically requested are these.
Building regulations completion or regularisation certificates for any controlled work: extensions, loft conversions, structural alterations, garage conversions, new bathrooms, altered drainage.
Planning permissions and any conditions attached, or a lawful development certificate where the work was permitted development.
FENSA or CERTASS certificates for replacement windows and external doors installed since 2002.
Gas Safe certificates for boiler installations and gas work.
Electrical certificates: installation certificates, minor works certificates, or a condition report.
HETAS or equivalent certificates for wood burners and solid fuel appliances, and evidence of a flue liner and chimney work.
Guarantees: damp proofing, timber treatment, roofing, cavity wall insulation, underpinning, and whether they are transferable.
Structural engineer's calculations for any structural work.
Party wall awards or consents.
An EPC, which is required to market the property.
Listed building consents where applicable.
Start early
Gather this before instructing an agent, not after an offer is accepted.
Chasing a certificate from a company that has since dissolved, or a council department with a backlog, is what delays sales.
Where to find missing documents
Building regulations: the local authority holds records and will search them for a fee.
Planning: most councils publish planning history online going back many years.
FENSA: there is an online lookup by address.
Gas Safe: records of notified work can be requested.
Electrical: the scheme provider may hold a copy, if you know who did the work.
Guarantees: the contractor, or the guarantee provider where it was insurance backed.
If something is genuinely missing
Three routes, in order of preference.
Obtain the certificate from whoever holds it.
Apply for regularisation, which brings the work into compliance and produces a certificate. Best where the work is structural or safety related.
Indemnity insurance, covering the risk of enforcement rather than fixing anything.
Note that approaching the council about the work generally invalidates the availability of indemnity insurance, so decide which route you are taking before making enquiries. Take your solicitor's advice on this specific point.
What buyers care most about
Anything structural: removed walls, beams, extensions, loft conversions.
Anything affecting safety: electrics, gas, fire precautions in a loft conversion.
Damp and roofing, particularly where a guarantee was relied on.
Windows, because the FENSA question is routine and easily answered or not.
Answer the form accurately
The property information form is a legal document and you are expected to answer honestly.
Failing to disclose known work, or misstating the position, can lead to a claim after completion.
Where you genuinely do not know, because work predates your ownership, say so rather than guessing.
Keeping the file for the future
Start a folder, physical or digital, the day you buy a house.
Put every certificate, approval, guarantee, invoice and set of drawings in it.
Add photographs of anything before it is covered up.
Hand it to the next owner. It makes the sale straightforward and it is the single most useful piece of housekeeping a homeowner can do.
Other things worth having ready
Boiler service records and the manual.
Warranties for appliances that are staying.
A new-build warranty where the property is under ten years old.
Details of any shared drives, access rights or maintenance arrangements.
Leasehold documents, service charge accounts and the freeholder's details where applicable.
Anything relating to a boundary dispute or an agreement with a neighbour.
Timing
Collect all of this before the property is marketed.
A sale that stalls for six weeks while a certificate is chased is a sale that can fall through, and buyers lose patience with repeated delays.
Give the file to your solicitor at the outset so enquiries can be answered immediately.
If you are buying
Ask the same questions of the seller, and read the answers on the property information form carefully.
Where certificates are missing for substantial or structural work, consider what the absence means rather than accepting indemnity insurance automatically.
A missing certificate sometimes means paperwork was lost, and sometimes means the work would not have passed.