Extensions: Rules and Limits

Extensions: Rules and Limits
DIY Guides Editorial 9 January 2026

Extensions sit at the intersection of everything: planning, permitted development, building regulations, party wall and drainage. It is worth understanding which is which.

Permitted development in outline

Many house extensions can be built without a planning application, provided they stay within all of the stated limits.

The limits cover projection, height, position, coverage and materials, and they differ between detached houses and others, and between single and two-storey work.

The figures are revised periodically, so check the current legislation and technical guidance rather than an article. The pattern is what matters here.

The kinds of limit that apply

Rear projection is limited, with a greater allowance for detached houses, and a further allowance available through a prior approval procedure.

Height is limited overall, with a lower limit on the eaves height within two metres of a boundary.

Side extensions are limited to single storey, a maximum height, and no more than half the width of the original house.

Nothing forward of the principal elevation facing a highway.

Coverage: a limit on the proportion of the original curtilage covered by buildings.

Two-storey extensions have tighter rules, including a minimum distance from the rear boundary.

Materials must be of similar appearance to the existing house.

Crucially, the reference is the original house, as built or as at a specified date. Previous extensions count against your allowance, including those built by someone else.

Prior approval for larger extensions

Larger single-storey rear extensions can be built under a prior approval process rather than a full application.

You notify the council, neighbours are consulted, and if there are no objections on the specified grounds the work may proceed.

It is quicker than a full application and it is a formal process with its own timescales, and it must be completed before work starts.

Where permitted development does not apply

Flats and maisonettes have no such rights.

Listed buildings require listed building consent regardless.

Conservation areas and other designated land have reduced rights, particularly for side extensions and cladding.

Article 4 directions and planning conditions can remove the rights entirely. Check the planning history of the house.

Building regulations apply regardless

An extension built under permitted development still needs full building regulations approval.

The main areas are:

Foundations, sized for the ground conditions, and deeper near trees or drains.

Structure, including the beam where the existing wall is opened up.

Damp proofing and the connection to the existing damp proof course.

Insulation and thermal performance of walls, roof, floor and glazing.

Drainage, including building over or near an existing drain, which needs the water company's agreement.

Ventilation, fire safety, escape and glazing.

Electrical work, which will involve new circuits and is notifiable.

Drains and sewers

Frequently the awkward discovery.

Building over or close to a public sewer requires a build-over agreement with the water company, which takes time and can dictate the design.

Establish where the drains run before designing anything, by lifting the covers and looking.

Party wall

Excavating for foundations within three metres of a neighbouring structure, and deeper than its foundations, requires notice under the Party Wall Act.

This catches most extensions on a terraced or semi-detached house, and many on detached ones.

Allow for the notice period in the programme.

Getting certainty

Apply for a lawful development certificate where you rely on permitted development.

It is the document a buyer's solicitor will ask for, and it settles the question permanently.

Trees and foundations

Foundations near trees, particularly on clay soils, need to be deeper to allow for ground movement.

Building control will ask about trees on and near the site, including ones that have been removed, since removing a mature tree from clay can cause heave.

Check for tree preservation orders before removing anything.

Thermal elements

Where an extension joins the house, the existing wall becomes an internal one, and the regulations set out how the junction and any retained elements are treated.

The area of glazing is also controlled, since it affects the overall thermal performance.

Conservatories and porches

Both can be exempt from building regulations within limits: a floor area threshold, separation from the house by external-quality doors, an independent heating control, and glazing that meets the safety requirements.

Remove the separating doors and the exemption is lost, and the structure must then comply in full.

This is a very common way of falling outside an exemption without realising.