The Party Wall etc. Act 1996 is a separate legal framework from planning and building regulations. It is about protecting a neighbour's property, and it catches more work than most people expect.
What triggers it
Three broad categories.
Work on an existing party wall or party structure. Cutting into it, removing chimney breasts from it, raising it, underpinning it, inserting a beam into it, or demolishing and rebuilding it.
Note that this includes the floor between flats, which is a party structure.
Building a new wall at or astride the boundary.
Excavating near a neighbour's building. Broadly, excavating within three metres of a neighbouring structure and to a lower depth than its foundations, or within six metres and cutting a line drawn at 45 degrees down from its foundations.
That excavation provision catches a great many extensions and is the one most often missed.
What does not trigger it
Ordinary domestic activity on your own side: plastering, decorating, fitting shelves, drilling for fixings.
Replacing a fence.
Work not affecting a party structure and not involving excavation near a neighbour.
Notice periods
These are statutory and cannot be shortened without agreement.
Two months for work on an existing party wall or structure.
One month for a new wall at the boundary, and for excavation.
The notice must contain specified information, including the names, the address, a description of the work, and the proposed start date.
Serve it on every adjoining owner, which includes freeholders and long leaseholders.
Start early. Notices delay projects far more often than the work itself.
What the neighbour can do
Consent in writing, and the process ends there. Keep the consent.
Dissent, which is not a refusal and does not stop the work. It moves the matter to surveyors.
Do nothing, which after fourteen days is treated as dissent.
A neighbour cannot veto the work. The Act regulates how it is done and protects them if damage occurs.
Surveyors and the award
Where there is dissent, either a single agreed surveyor acts for both, or each side appoints their own and the two select a third.
The surveyors produce a party wall award: a document setting out how and when the work may be done, working hours, access, and a schedule of condition recording the neighbour's property beforehand.
The schedule of condition is the valuable part, since it is the evidence if damage is later alleged.
The building owner normally pays the surveyors' fees, including the neighbour's surveyor.
An agreed single surveyor is considerably cheaper than two.
If you do not serve notice
Proceeding without a required notice is a breach.
The neighbour can seek an injunction stopping the work, which can happen at any point and is expensive and disruptive.
You lose the protection of the Act, including the presumption around damage and the agreed schedule of condition.
You remain liable for any damage, and without a schedule it is far harder to argue about what was already there.
It also causes problems on sale, since a buyer's solicitor may ask about it.
Practical advice
Talk to the neighbour before serving anything. A formal legal notice arriving unannounced is the fastest way to turn a cooperative neighbour into a dissenting one.
Explain what you are doing and when, and then serve the notice.
Use the standard notice forms, which are widely available.
Keep proof of service.
Take your own photographs of the neighbour's property beforehand even if no surveyor is involved.
Getting advice
Party wall surveyors will advise on whether notice is required, frequently at no charge for a straightforward question.
For anything involving excavation near a neighbour, or work on a shared wall, ask before starting.
Terraced and semi-detached houses
The dividing wall is a party wall, so a great deal of internal work engages the Act: removing a chimney breast, inserting a beam into it, or cutting in for a new structure.
This surprises people doing what feels like ordinary internal work in their own house.
Detached houses are not exempt either, since the excavation provisions apply wherever a neighbouring structure is close enough.
Keeping records
Keep the notices, the consents or the award, the schedule of condition and all correspondence.
These are asked for at sale and are the evidence if a dispute arises later.