When You Need a Structural Engineer

When You Need a Structural Engineer
DIY Guides Editorial 7 January 2026

A structural engineer works out whether a building will stand up, and produces the calculations that building control needs to approve the work.

Jobs that need one

Removing or altering a load-bearing wall.

Forming a new opening in a load-bearing wall, including a wider doorway.

Any beam: steel, timber or concrete, sized to carry the load above.

Loft conversions, where new floor joists and support are needed.

Extensions, for foundations, beams and the connection to the existing building.

Removing a chimney breast, which is a very common job and requires the remaining stack above to be supported. A chimney breast removed without support is a genuine collapse risk.

Underpinning and foundation work.

Cutting or notching joists beyond permitted limits, and trimming around a new opening.

Retaining walls above a modest height.

Where there is existing movement: cracking, sagging floors, bowing walls.

What they actually do

Visit and survey what is there, including establishing what is carrying what.

Calculate the loads: the weight of the structure, the floors, the roof, plus imposed loads and wind.

Size the members required, and specify the bearings, padstones and connections.

Produce calculations and drawings for building control.

Frequently they will also specify temporary works, meaning how the structure is propped while the work is done.

Temporary works matter

Frequently overlooked and the most dangerous part of the job.

Removing a wall means supporting everything above it before it comes out, using props and needles positioned and loaded correctly.

Inadequate propping causes collapses. This is not a part of the job to improvise.

Ask the engineer to specify the temporary support, and follow it.

What it costs

A modest job such as a single beam calculation is usually a few hundred pounds.

A full set of calculations for an extension or a loft conversion costs more.

Relative to the cost of the work, and to the cost of getting it wrong, it is a small proportion.

Building control will not approve structural work without calculations, so it is not optional.

Choosing one

Look for membership of a recognised professional body, and check they carry professional indemnity insurance.

Ask for a fixed fee for a defined piece of work.

Establish what is included: the site visit, the calculations, the drawings, revisions, and any liaison with building control.

Ask whether they will inspect during construction, which some clients arrange and which is worth considering on anything substantial.

What to have ready

A sketch of the layout with dimensions.

What is above the wall: another wall, a floor, a roof, a chimney.

The construction: solid brick, cavity, timber frame, and the floor and roof types.

The age of the property.

Photographs, including of the loft and any cracking.

What you want to achieve.

Where a builder is not enough

An experienced builder frequently knows what size beam is normally used in a given situation, and that is not a calculation.

Building control needs calculations from someone qualified, and the responsibility sits with the person who produced them.

A builder who says calculations are not needed for structural work is wrong, and that is worth knowing early.

When you probably do not need one

Non-load-bearing partition removal, once you have established it genuinely is non-load-bearing.

Work that does not alter how loads are carried.

Establishing whether a wall is load bearing is itself something to get right, and if there is any doubt, that is a reason to ask.

Working with the builder

Give the builder the calculations and drawings, and make sure they price from them.

Do not accept a variation from the specified beam size or bearing detail without going back to the engineer.

Building control will check what was specified against what was built.

Existing problems

Where a survey has found cracking, movement or subsidence, an engineer's report is what a lender or an insurer will want.

Do not start alterations on a building with unexplained movement until the cause is understood.

Alterations can make an existing problem worse, and they will certainly be blamed for it afterwards.

Timescales

Allow several weeks between instructing an engineer and having calculations in hand, and longer at busy times.

Building control then needs its own period to assess them, so start early.