Floor tiles crack for one reason above all others: movement in what is underneath them. Getting the substrate right is most of the job.
The substrate
Solid concrete or screed is ideal, provided it is sound, flat, dry and free of movement. Prime absorbent surfaces.
Timber floors move, and need work before they will take tile.
Fix down every loose board, replace damaged ones, and check for deflection by walking and bouncing on the floor.
Overboard with 15mm or thicker exterior grade plywood, screwed at close centres, typically every 200 to 300mm across the whole sheet, with joints staggered and a small gap between sheets.
A proprietary tile backer board is the alternative and is generally better, being dimensionally stable and often waterproof.
A decoupling membrane over a substrate that may move or crack allows small movements without transferring them to the tiles.
Never tile directly onto floorboards or chipboard.
Check the finished height against doors and appliances, since a tiled build-up is substantial.
Setting out
Find the centre of the room by measuring and marking the midpoints of opposite walls, then snap chalk lines between them.
Check the lines are square using the three-four-five method.
Dry lay tiles from the centre out in both directions, with spacers, and see where the cuts fall.
Adjust the centre point so the perimeter cuts are equal and reasonably wide. Never end with a narrow sliver against a wall.
Consider the entrance: the tiles seen first should be full ones where possible.
Where the room is very out of square, set out from the most visible straight line rather than from the centre.
Adhesive
Use a cement-based flexible adhesive suitable for floors and for the substrate. Ready-mixed adhesive is not suitable for floors.
Mix to the stated consistency and only as much as you can use within the pot life.
Spread with the notched trowel specified for the tile size, combing it out in one direction.
Aim for full coverage under each tile, particularly on a floor. Back-butter large tiles.
Lift a tile occasionally to check coverage, and adjust the trowel size if there are voids.
Work in an area you can reach without kneeling on laid tiles, and plan your route to the door.
Laying
Press each tile down with a slight twist so the ridges collapse.
Use spacers consistently.
A tile levelling system is worth using with large-format tiles, holding adjacent tiles flush while the adhesive sets and preventing lippage.
Check across several tiles with a straight edge as you go, not just tile to tile.
Clean adhesive out of the joints before it sets.
Leave movement joints where the manufacturer requires them, at the perimeter and across large areas.
Cutting
A manual cutter handles straight cuts in ceramic.
Porcelain and large tiles generally need a wet saw.
Use a diamond hole saw for pipes.
Wear eye protection and use water suppression, since tile dust contains silica and dry cutting produces a great deal of it.
Grouting
Wait for the adhesive to cure fully, usually at least 24 hours, and longer over underfloor heating.
Use a floor grout suited to the joint width, and a flexible grout over timber or heating.
Work it in diagonally with a float, filling the joints completely.
Remove the excess before it hardens and polish the haze off when dry.
Use silicone, not grout, at the perimeter and at any internal corner, since these joints move.
Underfloor heating
Do not turn the heating on until the adhesive and grout have cured fully, and then bring it up gradually over several days.
Heating a floor too early cracks the adhesive bond.
Large format tiles
Increasingly popular and considerably less forgiving.
They need a flatter substrate, since any unevenness shows as lippage at the edges.
They need full adhesive coverage, which usually means back-buttering as well as combing the floor.
A levelling system is close to essential.
They are heavy and awkward, and cutting them needs a large wet saw or a rail cutter.
Working order
Plan so you tile yourself out of the room rather than into a corner, and allow the adhesive to cure before walking on it.
Kneel on a board rather than directly on newly laid tiles.