Laying Vinyl and LVT Flooring

Laying Vinyl and LVT Flooring
DIY Guides Editorial 17 December 2025

Vinyl and LVT are the most forgiving floors to live with and the least forgiving to prepare for, because the material is thin and takes on the shape of whatever is underneath.

Flatness is everything

Any lump, ridge, screw head or board joint will show through, usually within a few months as the material relaxes.

Overboard a timber floor with plywood or hardboard, screwed at close centres with the heads punched below the surface, and fill the joints.

Use a levelling compound on an uneven solid floor.

Vacuum meticulously. A single piece of grit shows as a bump.

Check the moisture content of a solid floor and use a DPM where needed.

Sheet vinyl

Best for a small room where it can be laid in one piece with no joints.

Acclimatise it loosely rolled in the room for at least 24 hours, since it is much easier to handle warm.

Make a template from cardboard or paper for an awkward room, tape it together, and transfer it to the vinyl. This is far more reliable than cutting in place.

Where cutting in place, lay it with the excess turned up the walls, then press it into the angle and trim with a sharp knife against a straight edge, cutting slightly oversize first and trimming back.

Change the blade constantly. A blunt blade tears vinyl.

Cut around a toilet or pedestal by making relief cuts down to the base and trimming round.

Fix with double-sided tape around the perimeter for a small room, or spread adhesive for anything larger or where it will get wet.

Seal the perimeter with silicone in a bathroom or kitchen.

LVT: click or glue-down

Click LVT floats, so it can be laid quickly and lifted later. It needs an expansion gap and generally should not be laid over a soft underlay, which stresses the joints.

Glue-down LVT is bonded to the subfloor. It is more stable, has no expansion gap, feels solid, and handles temperature swings and underfloor heating better. It is the better choice for conservatories, kitchens and large areas.

Loose lay LVT relies on weight and friction and suits some commercial situations.

Setting out LVT

Find the centre of the room and set out from there, so the cuts at each side are equal.

Snap chalk lines at right angles as a reference, checked with the three-four-five method.

Dry lay a row in each direction and adjust the starting point so no edge cut is a narrow sliver.

For planks, stagger the end joints generously and irregularly.

Mix planks from several packs to distribute shade variation.

Adhesive

Use the adhesive the manufacturer specifies, and read the instructions carefully, because the two types behave very differently.

Pressure sensitive adhesive is spread and left to become tacky, then tiles are laid into it. It stays tacky and allows repositioning.

Hard set adhesive is laid into wet and grabs. It has a limited open time.

Spread with the notched trowel specified, covering only what you can lay within the open time.

Roll the floor with a floor roller after laying, which is what achieves proper bond and removes air.

Keep off it for the period stated.

Cutting

LVT is scored with a sharp knife against a straight edge and snapped.

Cut from the face side and score deeply enough that it snaps cleanly.

For curves and pipes, make a card template and cut with a knife or tin snips.

Warming a plank slightly makes it easier to cut and shape.

Finishing

Undercut door frames and slide the flooring underneath.

Fit threshold strips at doorways.

Seal the perimeter in wet areas.

Fit beading or skirting after laying, fixed to the wall rather than to the floor.

Common problems

Bumps and telegraphing: the subfloor was not flat enough, and the only cure is to lift and prepare properly.

Gapping at joints on click LVT: usually no expansion gap, or a soft underlay beneath.

Lifting edges on glue-down: insufficient adhesive coverage, laying outside the open time, or not rolling the floor.

Discolouration: rubber-backed mats and some castors mark vinyl permanently. Use felt pads and non-staining mats.

Peaking at joints: the floor has expanded with nowhere to go, usually because the perimeter gap was lost under the beading.