Self-levelling compound does most of the work if it is mixed and applied properly, and very little if it is not. The name is optimistic rather than descriptive.
Level or flat
Establish which problem you have.
A flat floor that slopes is fine for most coverings. Correcting it means building up one end substantially, which is expensive and reduces headroom.
An uneven floor with dips and humps is the real problem, since it telegraphs through thin coverings and causes floating floors to rock and click.
Most levelling jobs are about flatness rather than level.
Preparation
The compound bonds to what is under it, so this decides the outcome.
Remove all old adhesive, paint, dust and loose material.
Grind or chip off high spots rather than burying them, since levelling up to a hump wastes a great deal of compound. Use dust extraction, as concrete dust contains silica.
Repair holes and large cracks with a repair mortar first.
Prime the floor. This is not optional. Priming stops the substrate sucking water out of the compound, which otherwise cures too fast, cracks and fails to bond.
Use the primer the compound manufacturer specifies, diluted as directed, and allow it to become tacky before pouring.
Absorbent floors may need two coats.
Contain the edges
The compound is liquid and finds every gap.
Seal around the perimeter, under skirting, at doorways and around pipe penetrations with foam strip, tape or expanding foam.
Fit a batten across doorways.
Block any holes into the floor void, or the compound runs into the ceiling below.
Mixing
Use the exact water quantity stated. Too much water is the commonest error and produces a weak, dusty, cracked surface.
Mix with a paddle on a slow-speed drill until completely lump free, then let it stand briefly if directed.
Work in batches you can pour and spread within the working time, which is short, often 15 to 30 minutes.
Have everything ready before mixing the first batch: water, buckets, paddle, spiked roller, spiked shoes.
Pouring and spreading
Start at the far corner and work back towards the door.
Pour in strips and spread with a trowel or a smoothing bar to roughly the right thickness.
Use a spiked roller to release air bubbles and help it flow out, working across the surface within the working time.
Wear spiked shoes to walk on the wet compound.
Pour each batch into the previous one before it starts to set, so there is no visible joint.
Do not go back over an area that has begun to skin.
Depths
Every product has a minimum and maximum depth, and they matter.
Typical ranges are around 2 to 10mm for a thin product and 5 to 30mm or more for deep-fill compounds.
Below the minimum it will not flow or cure properly, and above the maximum it cracks.
For deep areas, build up in layers with the stated waiting time, or use a deep-fill product.
Timber floors
Standard compound is for solid floors. Timber moves, so use a compound specifically formulated as flexible and suitable for timber.
The floor must be rigid and well fixed first, and frequently overboarded with plywood, screwed at close centres.
Some systems require a mesh or a primer specific to timber.
Overboarding is often the simpler answer on a timber floor than levelling compound.
Drying and laying over it
Walkable in a few hours typically, and ready to cover after the stated period, which can be much longer.
Check the manufacturer's figure for laying impermeable coverings, since trapped moisture causes adhesive failure.
Check the flatness with a straight edge before laying, and sand off any ridges.
Where it goes wrong
Not priming, so the compound dries too fast and debonds.
Too much water, giving a weak dusty surface.
Working too slowly, so batches do not merge and leave ridges.
Pouring below the minimum depth, where it will not flow out.
Using a solid-floor product on timber.
Other approaches
For a timber floor with modest unevenness, overboarding with plywood is quicker, cleaner and adds strength.
For isolated dips, a repair mortar or a feather-edge filler is easier than levelling a whole room.
Cost and quantity
Compound is sold by the bag with a stated coverage at a given depth, and it goes a shorter distance than people expect.
Calculate the volume needed and buy a spare bag, since running out mid-pour leaves a visible joint.