Back to Projects

Preparing a Subfloor Before Laying

Preparing a Subfloor Before Laying
DIY Guides Editorial 15 December 2025

The subfloor is what determines whether a floor lasts, and it is the part people are most tempted to skip because none of it shows afterwards.

What you are checking for

Flatness, which is not the same as level. A floor can slope and still be flat, and flat is what matters for most coverings.

Movement and deflection, which cracks rigid coverings.

Damp, which destroys most coverings and their adhesives.

Soundness: loose boards, rot, crumbling screed, old adhesive.

Checking flatness

Lay a long straight edge or a spirit level on the floor and move it around, looking for gaps underneath.

A common tolerance is around 3mm under a 2m straight edge, and thin coverings need better than thick ones.

LVT and sheet vinyl are the least forgiving, since every lump and joint telegraphs through the surface within months.

Mark the high and low spots on the floor as you find them.

Checking for movement

Walk the floor slowly and listen and feel for deflection.

Bounce gently in the middle of each span.

Any movement rules out tiling until it is dealt with, since tile and grout crack under deflection.

Look underneath where possible for undersized joists, long spans, notched or drilled joists and missing noggins.

Checking for damp

Essential on any solid floor before laying anything impermeable.

The simple test is to tape a square of polythene tightly to the floor on all four edges and leave it for a few days. Condensation underneath, or a darkened patch of concrete, indicates moisture.

A hygrometer test gives a proper reading and is what a flooring contractor would use.

New concrete and screed take a long time to dry, commonly quoted as a day per millimetre of thickness for the first 50mm and longer beyond. Do not lay over it early.

Where damp is present, find the cause before covering it.

Timber floors

Fix loose boards, screwing rather than nailing, having checked for pipes and cables beneath.

Replace rotten or split boards.

Punch down any proud nails.

Overboard where the surface is uneven. Plywood of 6mm or thicker for thin coverings, screwed at close centres, typically 150 to 300mm, staggering the joints and keeping fixings away from services.

Hardboard is a cheaper option under vinyl and carpet, laid rough side up and fixed at close centres.

For tiling, use 15mm or thicker plywood or a proprietary tile backer board, fixed at the manufacturer's centres, or a decoupling membrane.

Do not tile directly onto floorboards or chipboard.

Chipboard floors

Common in modern houses, usually tongued and grooved and moisture resistant.

Check for swelling near bathrooms and around pipework, and replace damaged sheets.

Screw down any sheets that move.

Solid floors

Remove old adhesive, paint and loose material.

Fill small holes and cracks with repair mortar.

Use a self-levelling compound for anything more than minor unevenness, priming first.

Grind off high spots rather than trying to level up to them, using dust extraction, since concrete dust contains silica.

Old floor coverings

Vinyl floor tiles and the black bitumen adhesive under them, in properties before 2000, may contain asbestos.

Do not sand, scrape or break them up. Have them tested first.

Where old tiles are sound and well stuck, overboarding rather than removing is frequently the safer approach, and the height increase needs checking.

Before you lay

Vacuum thoroughly. Grit under a floor causes noise and wear.

Check the finished height against door clearances, appliances and thresholds.

Acclimatise the flooring in the room for at least 48 hours before laying.

Services in the floor

Lift a board and look before screwing anything down.

Pipes and cables run through and under joists, frequently just below the board surface, and a screw through a heating pipe is discovered slowly and expensively.

Mark the line of any services on the subfloor before covering it, and photograph the floor.

Joists

Where joists have been notched or drilled by previous work, the floor may deflect.

Notches should be in the top edge within limited zones and to a limited depth, and holes should be on the centre line. Substantial cutting weakens the joist and needs proper assessment.

Height and thresholds

Add up the whole build-up: membrane, underlay, board and any overboarding.

Check that against the door clearance, the bottom of any fitted units and the level of adjoining rooms.

It is far easier to undercut a door before the floor is down than afterwards.