Projects that stall usually do so for predictable reasons, and almost all of them are set in motion before the first tool comes out.

Starting before deciding

The most common mistake of all.

Demolition is satisfying and easy, which is why people start there. A room stripped back before the specification is settled is a room that stays stripped back.

Decide what the finished job looks like, down to the fittings, before anything is removed.

Draw it, measure it, price it and write it down.

Doing jobs in the wrong order

New flooring laid before plastering. Decorating before a rewire. A kitchen fitted before the appliances were chosen.

Each of these means doing something twice.

Work from watertight, to structural, to first fix, to plaster, to second fix, to joinery, to decorating, to flooring.

Not checking what needs consent

Building regulations and planning permission apply to more than people expect: structural alterations, new openings, drainage, replacement windows, certain electrical work, loft conversions and much else.

Retrospective approval is expensive and sometimes refused, and unapproved work causes serious problems on sale.

Check with building control before starting, not after.

Establish early whether the property is listed or in a conservation area, where the rules are quite different.

Ignoring asbestos

A safety failure rather than a planning one, and it belongs at the planning stage.

In any property built or altered before 2000, assume asbestos may be present in textured coatings, ceiling and floor tiles, insulation board, cement sheets, cisterns and around old boilers.

Do not sand, drill, cut or break anything suspect. Have it tested before disturbing it.

Removal beyond very limited circumstances is work for a licensed contractor.

No contingency

A budget with no margin stops when the first unforeseen problem appears, and one always does.

Carry ten to fifteen per cent, and twenty or more in an older property.

Underestimating time

Amateur work takes two to three times the trade estimate, spread across evenings and weekends, plus drying times that cannot be compressed.

Count available weekends rather than hours, and allow for the ones lost to weather and life.

Taking too much out at once

Removing the kitchen, the bathroom and two rooms' worth of flooring in one enthusiastic weekend creates a house that cannot be lived in and a project that cannot be finished in stages.

Work on one area at a time and finish it.

Not measuring properly

Ordering from a guess, forgetting the waste allowance, or measuring at the wrong height in a room that is not square.

Measure twice, allow for waste, and buy from one batch.

Buying the tools as you go

Each missing tool costs a trip and an hour, and the job stops.

List what a job needs before starting, including consumables, and get it all in one visit.

Not telling the neighbours

Cheap, easy and repeatedly skipped.

Tell them what is happening, roughly how long it will take, and when the noisiest parts will be. Give them a number.

Check whether party wall procedures apply to work on a shared wall, since they frequently do and the consequences of ignoring them are serious.

Skipping preparation

Particularly in decorating, where the finish depends almost entirely on the filling, sanding, caulking and priming that nobody enjoys.

Preparation is not the part before the job. It is most of the job.

Booking trades badly

Booking a plasterer before the electrician has finished, or a carpet fitter before the decorating is done.

Sequence the trades and confirm dates as each stage approaches, since slippage is normal.

Not writing anything down

Measurements, decisions, variations agreed on site, socket positions, where pipes and cables run.

Photograph walls and floors before they are closed up. In two years you will need to know what is behind them.

Being unrealistic about ability

Taking on a first plastering job in the living room, or first-time tiling in the main bathroom.

Learn on something small and hidden, and keep the visible rooms for once you have the technique.

Not finishing

The last ten per cent of a job takes longer than expected and is where most projects are abandoned.

Write a snagging list at the end of each stage and work through it before starting the next one.