Some jobs can be done at any time and others are governed entirely by temperature and moisture. Getting the season wrong wastes both the materials and the effort.
Temperature limits that matter
Most paints require a minimum of around ten degrees and will not cure properly below it. Check the tin, since figures vary.
The relevant temperature is the surface temperature and the overnight low, not the sunny afternoon reading.
Masonry paint and exterior wood finishes need dry conditions before and after application, typically several hours to a day without rain.
Mortar and concrete must not freeze while curing. Below about five degrees the chemical reaction slows and frost damages the set. Do not lay in frost or when frost is forecast.
Adhesives and sealants generally have minimum temperatures too, and silicone applied in the cold cures poorly.
Tarmac and asphalt repairs need warmth to compact.
Spring
The best all-round period for outdoor work.
Fence and shed treatment once the timber has dried out after winter.
Repairs to gutters, roofs and pointing, while there is time before autumn rain.
Groundwork, patios and paths, in workable soil.
Exterior painting once temperatures are reliably above the minimum.
Concrete and masonry, avoiding late frosts.
Summer
Long days and warm surfaces, with two cautions.
Do not paint in direct hot sun, which dries the surface before it flows out and causes brush marks, lap marks and poor adhesion. Follow the shade round the building.
Mortar and concrete dry too fast in heat and may need protecting or damping.
Best time for: roofing, rendering, exterior painting in the mornings and evenings, decking, garden walls, tarmac and any job needing extended dry weather.
Also the best time for anything requiring windows and doors to be open for ventilation, such as varnishing and solvent-based finishes.
Autumn
A closing window outdoors and the best time to prepare for winter.
Clear gutters after leaf fall, which is the single most useful autumn job.
Check and repair the roof before winter weather.
Draughtproofing, loft insulation and pipe lagging, which pay back immediately.
Service the heating before it is needed.
Finish outdoor projects rather than starting them, since the weather turns quickly.
Winter
Move indoors and use the time.
Decorating, provided the room is warm and can be ventilated.
Tiling, flooring, joinery, shelving, fitting kitchens and bathrooms.
Planning, measuring, ordering and getting quotes for spring work.
Servicing and sharpening tools.
Ventilation is the difficulty indoors in winter, since paint and adhesives need air movement and the house is shut up. Open windows for a period even when it is cold, and use extraction.
Watch for condensation, which is at its worst in winter and can be mistaken for damp.
Drying times change with the season
Everything takes longer in cold or humid conditions.
New plaster can take twice as long to dry in winter, and painting it too early causes problems.
Gloss applied in a cold room may remain tacky for days.
Allow extra time between coats rather than working to the tin's optimistic figure.
Watching the forecast
For outdoor work, check the overnight lows and the rain probability for the following forty-eight hours, not just the day itself.
Do not start anything that must be finished in one session unless the window is clear.
Have a covered fallback job for the day the weather breaks.
A rough calendar
Spring: outdoor repairs, groundwork, painting.
Summer: roofing, rendering, decking, big outdoor projects.
Autumn: gutters, roof checks, insulation, draughtproofing.
Winter: indoor work, planning and preparation for spring.
Working around the weather
Keep a tarpaulin and a way of covering exposed work at short notice.
Never leave a roof or a wall open overnight without protection.
Store bagged cement, plaster and plasterboard under cover and off the ground, since a single wet night ruins them.
Frost
Protect fresh mortar and concrete with hessian or frost blankets if a cold night is forecast, and do not lay at all in a hard frost.
Do not use materials that have been frozen in storage, particularly emulsion and adhesives, which separate and never recover.
Daylight
Short winter days limit outdoor work to a few useful hours, which is worth allowing for when planning weekends between November and February.