Time is the resource most people underestimate, and the gap between a trade's day and an amateur's weekend is larger than it looks.
Why it takes longer than you think
Setting up and clearing away. A trade arrives, works eight hours and leaves the site set up for tomorrow. Doing it in your own home means moving furniture out, covering everything, working, then making the room usable again. That can be an hour at each end of a three-hour session.
Learning as you go. The first metre of anything takes far longer than the tenth.
Trips to the merchant. Almost every job involves at least one unplanned trip, and each one costs an hour.
Interruptions. Working at home means answering the door, feeding people and stopping.
Drying and curing times, which cannot be compressed at all.
Times you cannot rush
These govern the schedule regardless of how fast you work.
New plaster: allow several weeks to dry before decorating, and longer in winter or on a solid wall. It must be uniformly pale, with no dark patches.
Emulsion between coats: two to four hours typically.
Oil-based gloss: overnight, and sometimes longer in cold or damp conditions.
Filler: minutes for a shallow skim, hours for a deep fill, and deep fills should be built up in layers.
Tile adhesive: usually twenty-four hours before grouting.
Grout: another day before sealing or heavy use.
Concrete: a day or two before light loading, and it continues gaining strength for weeks.
Postcrete for fence posts: a few hours before hanging panels, and check the packet.
Self-levelling compound and screed: check the product, since some are ready in hours and traditional screed takes weeks.
Laminate and engineered flooring: acclimatise in the room for at least forty-eight hours before laying.
Rough guides for common jobs
These assume an average room and someone reasonably capable, working properly.
Painting a room, walls and ceiling only: a weekend including preparation.
Painting a room including woodwork: three to four days spread over two weekends, because of drying between coats.
Wallpapering a room: a full weekend for a plain paper, longer with a large pattern repeat.
Tiling a bathroom wall: a weekend to tile, plus another day to grout and seal.
Laying laminate in an average room: a day, plus acclimatisation beforehand.
Fitting a kitchen: a week or more of full days for a trade, and several weeks of evenings and weekends for an amateur.
Building a fence, six panels: a weekend for posts, then a second session once the concrete has set.
Laying a patio: a long weekend for excavation and sub-base, another for laying, and a further day for jointing.
Multiply for reality
A reasonable rule is that a job estimated at a day of trade time takes an amateur two to three times as long, spread over more sessions.
The first time you do anything, double it again.
Planning around real life
Count the weekends available rather than the hours, since work happens in weekend-sized blocks.
Allow for the weekends that will be lost to weather, illness and other commitments.
Never start a job that leaves the kitchen or the only bathroom unusable unless you can finish it in the time available.
Book any trade well in advance, since good ones are booked weeks or months ahead.
The order matters for time too
Start the parts with long drying times early in the week or the weekend.
Do preparation on an evening so the messy productive work fills a full day.
Finish each session at a natural stopping point rather than mid-wall, since resuming halfway across a wall shows in the finish.
Weather-dependent work
Outdoor jobs are governed by conditions rather than by the calendar.
Masonry paint, wood treatment, concrete and mortar all have minimum temperatures and cannot be applied in rain or frost.
Allow for lost weekends, and start outdoor projects early in the season rather than in September.
The half-finished trap
Projects stall when a job is started that cannot be reached to a usable state in the time available.
Break work into stages that each end somewhere tolerable, so the house is liveable between sessions.
Never take a kitchen or the only bathroom out on a Saturday morning without knowing exactly how it goes back.