Plasterboard is 12.5mm of gypsum with paper facings. It has almost no strength on its own, and the fixing you choose has to work with that.
The first rule
Find a stud.
A screw into a timber stud is stronger than any plasterboard fixing by a wide margin, and it costs nothing.
- Studs are typically at 400mm or 600mm centres
- Always a stud at each end of a wall and each side of an opening
- Noggins, horizontal members, usually at mid-height
- Use a detector, a magnet to find the fixing line, or tap along the wall
- Find both edges of the stud and fix into the centre
For anything heavy, a stud is not optional. If the positions do not suit, fix a timber batten across two or more studs and mount to that.
Step 1: identify the wall
Stud partition. Sounds hollow throughout, with a solid line every 400 or 600mm. Plasterboard on a timber or metal frame with a void behind.
Dot and dab. Plasterboard stuck to a masonry wall on dabs of adhesive. Sounds hollow, and there is masonry 10 to 30mm behind, not a void.
- A cavity fixing may not have room to open
- Better to drill through into the masonry and use a longer plug, allowing for the void
- Frame fixings work well here
Lath and plaster. Older houses. Thin timber laths with plaster pushed through. Fragile, and the laths give something to fix into. Locate a lath, or better a stud, and take great care: it crumbles easily.
The fixings
Plasterboard plug, or self-drill plug. A coarse-threaded plastic or metal plug screwed directly into the board with a screwdriver, no drilling needed.
- Quick and easy
- Light loads only: a picture, a small shelf, a curtain track bracket
- Metal versions hold better than plastic
- Screw in until flush; overtightening chews the board
Hollow wall anchor, sometimes called a molly or a cavity anchor. A metal sleeve that folds and grips the back of the board as the screw is tightened.
- Medium loads. More reliable than a self-drill plug
- Drill the stated hole, insert, and tighten to set the legs
- A setting tool holds it while it deforms and is worth having
- The screw can be removed and refitted without losing the anchor, which is a real advantage
Spring toggle. Two hinged metal wings on a spring, folded to pass through the hole and springing open behind.
- The strongest conventional cavity fixing. The wings spread the load over a large area of board
- Needs a hole large enough for the folded wings, which is noticeably bigger than the bolt
- If the bolt is removed, the toggle falls into the cavity and is lost
- Needs enough clear depth behind for the wings to open
Gravity toggle. A bar that drops and lies across the back of the board. Similar strength, and also lost if removed.
Strap or channel toggle. A toggle with plastic straps holding it in place while tightening, then snapped off. Combines the strength of a toggle with the convenience of not dropping it.
Nylon cavity fixing. Plastic legs that fold behind. Light to medium loads.
Step 2: about load ratings
Treat published figures with caution.
- Ratings are usually established in laboratory conditions on ideal board
- Real walls have damaged board, old fixings nearby, damp, and unknown thickness
- Derate generously. Working to a fraction of the stated figure is sensible
- Spread the load across several fixings rather than relying on one
- A shelf pulls outward at the top and downward, so the top fixings take a leverage load far greater than the weight
The load on a bracket is not simply the weight of the object. The further it projects, the greater the leverage on the top fixings.
Step 3: what needs a stud
Always fix to a stud, or a batten spanning studs:
- Wall-mounted televisions
- Kitchen wall units
- Radiators
- Heavy mirrors
- Shelving carrying books
- Grab rails and handrails
- Anything a person might pull on or a child might climb
- Boilers and heavy appliances
A grab rail that comes off the wall is a serious injury. These are safety-critical and must go into structure.
Step 4: fixing into a stud
- Locate both edges and mark the centre
- Confirm with a fine pilot hole in a spot that will be covered
- Use a screw long enough to get at least 30 to 40mm into the timber
- Drill a pilot through the board and into the stud
- Drive the screw firmly and stop as it seats
- Check the fixing is central; a screw at the edge of a stud splits it and holds poorly
Step 5: fitting a toggle
- Drill the stated hole size, which is larger than you expect
- Pass the bolt through the item first, since the toggle cannot come back through the hole once fitted
- Thread the toggle onto the bolt, wings folded towards the bolt head
- Push through the hole until you feel the wings spring open
- Pull back gently to seat the wings against the board
- Tighten while maintaining that pull
- Do not overtighten, which crushes the board
Step 6: a batten is usually the answer
For anything substantial where the studs do not line up.
- Locate two or more studs
- Fix a timber batten horizontally across them, screwed firmly into each
- Mount the item to the batten anywhere along its length
- The load goes into the studs, not the board
- The batten can be painted to match, boxed in, or hidden behind the item
This is what professionals do, and it is stronger than any cavity fixing.
Before drilling
- Check for cables and pipes. A stud wall carries services in the void, and the safe zones apply
- Never drill directly above or below a socket or switch
- Isolate the circuits where uncertain
- Check what is on the other side of the wall
If it goes wrong
Fixing pulled out: the board has failed. Move 100mm, use a stronger fixing, or find a stud.
Hole enlarged and nothing grips: patch the board properly and fix elsewhere.
Toggle fell into the cavity: it is gone. Fit a new one, or use a strap toggle.
Cavity fixing will not open: a dot and dab wall, with no void. Drill into the masonry instead.
Shelf sagging away from the wall: the top fixings are taking a leverage load. Find a stud.