Back to Tools

Buying Materials and Merchants

Buying Materials and Merchants
DIY Guides Editorial 4 June 2026

Where you buy makes a substantial difference to price, quality and advice. The differences are not always obvious.

Builders merchants

  • Better prices, particularly on bulk materials: timber, aggregates, cement, plasterboard, insulation
  • Wider and better quality range, especially structural and trade materials
  • Genuinely knowledgeable staff, who deal with these questions daily and will usually give good advice
  • Delivery available, including hiab offload for heavy loads
  • Will cut sheet material and sometimes timber
  • Open to the public, despite an appearance otherwise
  • Prices frequently not displayed, so ask
  • Earlier closing, and often limited weekend opening

Do not be put off by the atmosphere. Merchants want customers, and being clear about what you need gets a helpful response.

Trade accounts

  • Frequently available to anyone, not only to trades
  • Prices are commonly better than the counter price, sometimes considerably
  • Ask what an account requires; a cash account is usually simple to open
  • Always ask for a price on a larger order. The counter price is frequently a starting point
  • Get a written quotation for anything substantial and compare across merchants
  • Build a relationship with one merchant, which pays off in price and in advice

DIY stores

  • Convenient hours, including Sundays
  • Everything under one roof, with prices displayed
  • Good for small quantities, fixings, tools and decorating materials
  • More expensive on bulk materials, sometimes substantially
  • Narrower range and frequently lower grades of timber
  • Variable advice
  • Sheet cutting available at some stores

Online

  • Good for comparing prices and for specialist items
  • Frequently the best route for tools, ironmongery and specialist fixings
  • You cannot inspect timber before buying, which matters
  • Delivery charges can be significant on heavy items
  • Check the returns policy before ordering
  • Read the specification carefully; photographs are frequently generic

Specialist suppliers

  • Timber merchants for hardwood, better quality softwood and machining
  • Plumbers and electrical merchants, which usually have better range and prices than a general store
  • Reclamation yards for matching old materials: bricks, tiles, doors, ironmongery
  • Tile, flooring and stone suppliers for range and advice
  • Local independent suppliers frequently give the best advice of all

Step 1: calculating quantities

  1. Measure carefully and write it down
  2. Calculate the area or volume needed
  3. Add a waste allowance
  4. Round up to whole packs or standard lengths
  5. Check pack quantities: tiles per box, boards per pack, coverage per bag
  6. Order all of it at once, in the same batch

Typical waste allowances:

  • Tiles, straight lay: 10 per cent
  • Tiles, diagonal or patterned: 15 to 20 per cent
  • Flooring: 10 per cent, more for a complex room
  • Timber: 10 to 15 per cent for defects and cutting
  • Concrete: 10 per cent for uneven ground and spillage
  • Wallpaper: calculate in drops, not by area

Running out is far more expensive than a small surplus: a second delivery, a different batch, and a stopped job.

Step 2: ordering timber

  • Write a cutting list and take it with you
  • Work out how the pieces come from standard lengths, which is far cheaper than cut lengths
  • State the size, the grade, whether sawn or planed, and the treatment class
  • Remember nominal is not actual
  • Ask to select boards yourself if quality matters, and restack tidily
  • Ask whether they will cut sheets to your list

Step 3: delivery

  • Usually worth it for anything heavy or bulky, and frequently cheap or free above a minimum order
  • Check access before ordering: lorry size, turning space, overhanging trees, weight limits, parking restrictions
  • Ask what offloading is included. Kerbside delivery means exactly that, and moving a tonne of aggregate from the kerb is a day's work
  • Ask about a hiab or a mechanical offload for heavy items
  • Be there for the delivery if you can
  • Have somewhere prepared to put it: level, off the ground, out of the way
  • Arrange covering if it will be outside

Step 4: checking a delivery

Do this before signing, since it is very difficult afterwards.

  1. Count everything against the delivery note
  2. Check sizes, grades and specifications match what you ordered
  3. Check batch numbers are consistent across tiles, paint and flooring
  4. Inspect for damage: broken boards, damaged corners, split bags, wet plasterboard
  5. Check timber for excessive bow, twist and damage
  6. Note any problem on the delivery note before signing, and photograph it
  7. Report shortages and damage immediately
  8. Keep the delivery note and the receipt

Step 5: storing it

  • Off the ground and covered
  • Timber stickered and flat, away from external walls
  • Sheets flat or upright, never leaning at an angle
  • Cement, plaster and plasterboard must stay dry. A wet bag of cement is ruined
  • Secure valuable materials; building materials are stolen from front gardens routinely
  • Do not block a pavement or a highway
  • Bring materials indoors to acclimatise where required

Step 6: returns and surplus

  • Ask the returns policy before buying, particularly on bulk materials
  • Many merchants take back unopened full packs, sometimes with a handling charge
  • Cut, special order and mixed paint is generally not returnable
  • Keep everything in its packaging until used
  • Keep receipts
  • Keep a labelled surplus of tiles, flooring and paint for repairs, with the batch noted

Step 7: buying well

  • Buy the best you can afford on things that are difficult to replace: anything buried, structural or behind a finish
  • Economise on things easily changed later
  • Do not buy cheap fixings. They are the smallest cost and the commonest failure
  • Ask for advice; merchants prevent a great many mistakes
  • Buy the whole job at once for anything batch sensitive
  • Compare like with like: a cheaper grade is not a cheaper price
  • Factor in delivery, waste and your own time

If it goes wrong

Ran out mid-job: the waste allowance was too small. Order extra next time.

Second batch does not match: box the batches together, or use the new batch on a separate wall.

Delivery left at the kerb: ask what offloading is included before ordering.

Damaged materials signed for: note damage on the note before signing.

Timber worse than expected: select it yourself, or use a timber merchant.