Overboarding gives a flat, sound ceiling without taking the old one down. It is heavy, awkward work and entirely achievable with the right approach and a second person.
When it is the right answer
- Heavy or deep textured coating that will not skim well
- A cracked or slightly sagging ceiling where the plaster is still sound
- A textured coating that may contain asbestos, which you do not want to disturb
- An uneven ceiling that needs a fresh flat surface
- Where you are fitting downlights or insulation anyway
When it is not
- The existing plaster is crumbling, blown or saturated. It should come down
- The joists are undersized or already loaded
- A very low ceiling, where 15 to 20mm matters
- Where there is any suspicion of structural movement
Overboarding adds weight; it does not remove any.
What you need
- Plasterboard, 9.5mm or 12.5mm
- Drywall screws long enough to reach 25mm into the joists
- A joist detector, and a cable and pipe detector
- Drill driver with a drywall screw setter
- Plasterboard saw and a sharp knife
- A board lifter, or a second person
- Chalk line, tape measure, pencil, straight edge
- Scrim tape and jointing compound
- Broad knives and a pole sander
- Safety glasses, gloves, dust mask
Step 1: locate the joists
- Use a detector to find the joists and mark their centres on the ceiling
- Confirm each with a fine pilot hole, feeling for solid timber
- Snap chalk lines along each joist so they remain visible once the board is up
- Mark the joist positions on the wall as well, so you can find them with a board covering the ceiling
- Note the joist spacing, typically 400 or 600mm
Check for cables and pipes above the ceiling before fixing anything. Isolate the lighting circuit and any circuit that runs through the void.
Step 2: choose the board
- 9.5mm: lighter and easier to handle, suitable for joists at 400mm centres
- 12.5mm: stiffer, better at 600mm centres, and heavier
- Moisture-resistant board: for bathrooms and kitchens
- Fire-rated board: where required by the ceiling's fire resistance, such as under a loft conversion or between flats
Where the ceiling forms part of a fire separation, the board specification is not a matter of preference. Check what is required before buying.
Step 3: work out the screws
The screw must pass through the new board, the existing plaster and any texture, and still reach at least 25mm into the joist.
Measure the existing ceiling thickness with a fine drill and a depth mark, add the new board thickness, then add 25mm.
Too short and the boards will come down.
Step 4: set out the boards
- Run the boards at right angles to the joists
- Start at one corner and work across
- Stagger the end joints between rows, so no continuous joint runs across the ceiling
- Board joints should land on the centre of a joist
- Leave a small gap at the walls
Step 5: lift and fix
A sheet of plasterboard overhead is where injuries happen.
- Hire a board lifter, which holds the sheet against the ceiling while you fix it. It is inexpensive and transforms the job
- Or use two people and props cut to length
- Position the board and check the joist lines
- Fix at around 150mm centres along every joist the board crosses
- Set the screws just below the surface without breaking the paper face
- Keep screws at least 15mm from a board edge
- Work from the centre of the board outwards
A screw setter bit stops you driving through the paper, which is what makes a fixing useless.
Step 6: cuts and openings
- Measure and mark, then score the paper face with a knife against a straight edge
- Snap the board over the cut and slice the back paper
- For openings, mark the position, drill a start hole and cut with a plasterboard saw
- Cut openings for light fittings before lifting the board where you can
Step 7: tape and finish
- Bed scrim tape over every joint
- Apply jointing compound over the tape with a broad knife, feathering the edges
- Fill the screw heads
- Apply a second wider coat when dry, feathered further
- Sand with a pole sander
- Or have the whole ceiling skimmed, which gives a better result
Step 8: before painting
Skimmed plaster needs around four weeks to dry, then a mist coat and two full coats.
A taped and jointed board ceiling needs a plasterboard primer or a mist coat, then two coats.
If it goes wrong
Boards sagging: screws missed the joists, or the centres were too wide.
Screws pulling through: driven too deep, breaking the paper. Add screws alongside.
Cracks along joints: joints not staggered, or not scrim taped.
Board fell during fixing: use a board lifter. Do not attempt it alone.
Cable struck: isolate the supply and get it repaired properly.
What changes afterwards
- The ceiling drops by 15 to 20mm, so coving may no longer fit and will need renewing
- Downlights need to reach through the extra thickness; check the fitting depth
- Door architraves and picture rails may need adjusting at the top
- Light fittings need extending or refitting
How long it takes
Locating joists and marking out takes a couple of hours.
Boarding an average room is a day with two people, and taping and jointing is another day with drying in between.
Skimming adds a day plus four weeks of drying before painting.
Hiring a board lifter
A plasterboard lifter holds the sheet flat against the ceiling on a winch while you fix it.
It is cheap to hire for a day, allows one person to board a ceiling alone, and removes the single most dangerous part of the job.