Back to Decorating

How to Paint Exterior Woodwork

How to Paint Exterior Woodwork
DIY Guides Editorial 2 February 2026

Exterior paint is doing a job, not a decoration: it keeps water out of timber. Where it fails, the timber rots, and the failures are always in the same places.

What you need

  • Exterior wood primer
  • Exterior undercoat and finish, from one manufacturer's system
  • Shellac knotting solution
  • Two-part exterior wood filler
  • Wood hardener if there is soft timber
  • Exterior frame sealant and a gun
  • 80, 120, 180 and 240 grit abrasive
  • Scraper, shave hooks, filling knives
  • Brushes: 25mm, 50mm, 75mm
  • Dust sheets, and secure access equipment

Step 1: check the weather

This determines whether you can work at all.

  • Minimum temperature is usually around 10 degrees; check the tin. The relevant figure is the surface temperature and the overnight low
  • Do not paint if rain is forecast within the recoat window, which is several hours
  • Never paint onto damp timber. Give it two or three dry days after rain
  • Do not paint in direct hot sun, which skins the surface before it flows out
  • Never paint if frost is forecast within 24 hours
  • Stop by mid-afternoon in autumn, so the surface is dry before evening dew

Follow the shade around the building through the day.

Step 2: assess the timber

Push a screwdriver into the timber at the bottom of every window, at the bottom of doors, at joints, and at end grain.

If it goes in easily, the timber is rotten.

  • Cut out soft timber back to sound material
  • Treat the surrounding area with wood hardener where it is only slightly softened
  • Fill with two-part exterior wood filler, which is far stronger than ready-mixed
  • Splice in new timber where the damage is extensive
  • Never fill over rot. It traps moisture and accelerates the decay

Step 3: strip and prepare

  1. Scrape off all loose and flaking paint back to a firm edge
  2. Feather the edges with 80 then 120 grit so there is no step
  3. Sand sound paintwork with 180 until the shine has gone
  4. Test for lead first in any property built before 1992, and do not dry sand or heat-strip if it is present
  5. Fill and sand
  6. Rake out and replace failed putty and sealant
  7. Wash down, rinse, and let it dry completely

Step 4: knot and prime

Apply shellac knotting to every knot and resinous streak, two coats.

Prime all bare timber with an exterior wood primer, the same day it is exposed.

End grain is where rot starts. Give every cut end, every joint and the bottom rail of doors and windows two or three coats of primer, letting each soak in until it stops absorbing.

Prime the underside and the back of anything you can reach.

Step 5: seal the joints

After priming and before the finish coats.

Seal the joint between the frame and the masonry with an exterior grade low-modulus sealant.

Seal joints in the joinery itself where water could enter.

Do not seal drainage slots in the bottom of frames, which let water out.

Step 6: undercoat and finish

  1. One or two coats of exterior undercoat, sanded with 240 between
  2. Two coats of exterior finish
  3. Sand lightly with 240 between finish coats
  4. Take the paint about 2mm onto the glass, which seals the putty line
  5. Take the paint over the edge onto the underside where practical

Use one manufacturer's system throughout, since primers, undercoats and finishes are formulated to work together.

Microporous systems

Modern exterior paints described as microporous allow water vapour out of the timber while keeping liquid water out.

This matters because timber that gets damp needs to dry, and a completely impermeable film traps moisture and blisters.

They are generally water-based, flexible, and do not yellow.

Do not mix a microporous finish over a traditional oil system unless the manufacturer says it is compatible, since the benefit is lost.

Step 7: access

Use a properly footed ladder at the correct angle, tied where possible, or a tower.

Never overreach: move the ladder.

Do not work at height alone, in wind, or on wet ground.

Maintenance

Inspect exterior paintwork annually, in autumn.

Deal with any crack, blister or bare patch immediately. Water entering a small failure does the damage.

Expect to repaint every four to six years, sooner on south and west elevations.

If it goes wrong

Paint blistering: moisture behind it. The timber was damp when painted, or water is getting in elsewhere.

Peeling in sheets: painted onto damp or unsound timber, or not keyed.

Rot returning: not cut back to sound timber, or end grain not sealed.

Cracking at joints: the joints move. Seal them and use a flexible finish.

Order for a whole elevation

  1. Fascias, soffits and bargeboards first, at the top
  2. Then gutters and downpipes if they are being painted
  3. Then window frames and doors
  4. Then any lower joinery, gates and fences

Working top down means drips fall onto unfinished work.

How long it takes

Preparation is the bulk of it. A house with tired exterior joinery can take a week to prepare and two days to paint.

Plan it across a settled spell in late spring or early summer, and do not start in September.

Working at height safely

  • Set a ladder at roughly one out for every four up
  • Foot it or tie it at the top
  • Never stand above the third rung from the top
  • Do not overreach: your belt buckle should stay between the stiles
  • Use a tower or scaffold for anything above single-storey height or lasting more than a few minutes