Primer, undercoat and finish each do a different job. Undercoat is the one people skip, and it is the coat that builds the body and gives the finish something flat to sit on.
The three coats and what each does
Primer bonds to the bare substrate and seals it. It goes on bare timber, bare metal or bare MDF.
Undercoat is highly pigmented and opaque. It hides what is underneath, builds film thickness, and sands beautifully flat.
Finish coat provides the sheen, the colour and the durable surface. It is formulated to look good, not to hide things.
Using two coats of gloss instead of undercoat plus gloss gives a worse result, because gloss does not hide and does not sand as well.
What you need
- Undercoat matched to your finish system: water-based under water-based, oil-based under oil-based
- A 50mm or 75mm brush
- Paint kettle
- 240 grit abrasive and a sanding sponge
- Tack cloth
- Fine surface filler and a small knife
- A torch
Step 1: apply the first undercoat
- Make sure the primer or the existing paint is sound, sanded and dust free
- Stir the undercoat thoroughly, since the pigment settles heavily
- Apply an even coat, brushing along the grain
- Do not apply it thickly. It is meant to be flatted back
- Lay off in one direction with light pressure
- Let it dry fully: check the tin, typically 4 to 6 hours for water-based and 16 to 24 for oil-based
Step 2: inspect and fill
Undercoat reveals defects that were invisible on bare or previously painted timber.
Shine a torch along the surface at a shallow angle.
Fill any dents, hairline splits or hollows you can now see with fine surface filler, leave it proud, and sand flush when hard.
Spot-prime the filled areas.
Step 3: sand it flat
This is the point of undercoat.
Sand with 240 grit on a block, working along the grain, until the surface is genuinely flat and uniformly dull.
Use a sanding sponge on mouldings so you follow the profile rather than rounding it.
Check with the torch again. Any ridge or hollow left now will be visible through the finish.
Dust off and wipe with a tack cloth.
Step 4: a second undercoat
Apply a second coat where:
- You are changing colour significantly
- The surface was patchy or had a lot of filler
- You want the best possible finish
- The first coat did not cover evenly
Sand the second coat with 240 in the same way.
Two undercoats and one finish coat frequently looks better than one undercoat and two finish coats, because the flatness is built in the layer that sands well.
Tinting the undercoat
Worth doing under strong or dark colours.
White undercoat under a dark gloss means the gloss has to do all the hiding, which takes extra coats.
Ask the merchant to tint the undercoat towards the finish colour, or use a grey undercoat under deep shades.
Under a pale finish, white undercoat is correct.
Matching the system
Use undercoat and finish from the same system and preferably the same manufacturer.
Water-based undercoat under water-based finish. Oil-based under oil-based.
Mixing systems can work and can also cause poor adhesion, extended drying or a soft film. Where you must, use an adhesion primer between them.
When you can skip undercoat
- Repainting the same colour over sound, existing paintwork in good condition
- Where the finish paint is a self-undercoating type and the surface is already the right colour
- Where a very slight colour adjustment is all that is needed
In those cases, sand to key, then two finish coats.
Do not skip it on bare timber, on a colour change, on filled or repaired surfaces, or where you want a high-quality finish.
How many coats in total
- Bare timber, best finish: knotting, primer, two undercoats, two finish coats
- Bare timber, normal: knotting, primer, undercoat, two finish coats
- Sound existing paint, same colour: sand, two finish coats
- Sound existing paint, colour change: sand, undercoat, two finish coats
If it goes wrong
Finish looks patchy over the undercoat: the undercoat was uneven or absorbent. Sand and apply another undercoat.
Old colour showing through: not enough undercoat, or it should have been tinted.
Undercoat will not sand smooth: applied too thickly, or not fully dry. Let it harden and try again.
Finish coat lifting the undercoat: incompatible systems, or recoated too early.
Primer or undercoat
The terms are used loosely and they are different products.
Primer is for adhesion and sealing on a bare substrate. It is not designed to hide colour or to be sanded flat.
Undercoat is for opacity and build. It is designed to sand.
Primer-undercoat combines both to a degree, and is a reasonable compromise on a small job. For a good finish, use them separately.
Undercoat on metal
Bare or rusted metal needs a metal primer, not a wood primer.
Sand rust back to bright metal, apply metal primer immediately before it flashes over, then undercoat and finish.
How much you need
Undercoat covers roughly 14 to 16 square metres per litre.
For an average room's woodwork, skirting, architrave, a door and a window, allow around a litre of undercoat and a litre of finish.
Buy the undercoat and the finish at the same time so they are from the same system.
Stirring
Undercoat settles harder than any other paint, since it is heavily pigmented.
Stir it thoroughly from the bottom before use and again periodically, or the first part of the tin is thin and the last is solid.