Tiles do not stick to dust, paint, damp or a wall that moves. Almost every tiling failure traces back to the substrate rather than the tiling.
What you need
- A long straight edge, 1.8m or 2m
- Spirit level
- Sugar soap, sponges, buckets
- Acrylic primer or SBR, as appropriate
- Filler, or bonding coat for larger hollows
- Tile backer board, screws and washers, and jointing tape for wet areas
- Tanking kit for showers
- 120 grit abrasive
Step 1: check flatness
This governs which tiles you can use.
- Hold a long straight edge against the wall vertically, horizontally and diagonally
- Note the size of any gap behind it
- Mark the high spots and the hollows in pencil
A deviation of more than about 3mm over 2m needs correcting before tiling with anything large.
Small tiles tolerate more. A 600mm tile tolerates almost nothing, because a rigid tile cannot follow a curve and the corners lip.
Fill hollows with bonding coat or a suitable filler, and knock off or sand down high spots.
Step 2: what you can tile onto
Sound plaster: yes, up to about 20kg per square metre. Must be fully cured, which is around four weeks for skim. Prime it.
Plasterboard, dry areas: yes, up to around 32kg per square metre. Prime it. Boards must be securely fixed with no movement.
Plasterboard in a shower or wet area: no. Even moisture-resistant board is not a waterproof backing. Use tile backer board.
Tile backer board: the correct choice for any wet area. Waterproof, stable, and carries more weight.
Rendered masonry: yes, if sound and flat. Prime it.
Painted walls: only if the paint is sound and well keyed. Sand thoroughly to remove all sheen. Gloss and silk paint must be sanded back hard or removed. Where the paint is at all doubtful, strip it.
Wallpaper: never. Strip it completely.
Timber floors: not directly. Overboard with tile backer board or 15mm plywood screwed at close centres.
Step 3: prime the surface
Priming controls suction, which is what stops the adhesive drying out before it bonds.
- Make sure the surface is clean, dry and dust free
- Apply an acrylic tile primer, or SBR diluted as the manufacturer states
- Work it well in, covering the whole area
- Let it dry fully, typically one to two hours
- Apply a second coat on very absorbent surfaces such as new plaster or aerated blockwork
Unprimed plaster sucks the water out of the adhesive before it can cure, and the tiles come off in sheets months later.
Step 4: wet areas and tanking
Inside a shower enclosure or a wet room, the substrate must be waterproof.
- Fix tile backer board across the shower area, following the board manufacturer's fixing pattern
- Tape and seal the joints with the system's jointing tape and sealant
- Apply a tanking membrane: a liquid applied in two coats, or a sheet system
- Use the system's reinforcing tape at all internal corners and around the tray or bath edge
- Seal around pipe penetrations with the collars provided
- Let it cure fully before tiling
Grout is not waterproof. It is water-resistant at best, and water passes through it over time. The tanking behind the tiles is what keeps the wall dry.
Step 5: floors
- Check for deflection: a floor that flexes will crack the tiles or the grout
- Screw down any loose boards
- Overboard timber floors with tile backer board or 15mm ply, screwed at 200 to 300mm centres across the whole sheet
- On concrete, check for cracks and dampness, and use a self-levelling compound if it is uneven
- Prime before laying
- Use a flexible adhesive on any timber floor or where there is underfloor heating
Step 6: final checks
- Surface clean, dry, dust free and primed
- Flat within tolerance for the tile size
- No movement anywhere when pressed
- Wet areas tanked and cured
- Fixings and pipe positions noted
- New plaster fully dry, four weeks for skim
If it goes wrong
Tiles falling off: unprimed or dusty surface, or tiling onto paint or wallpaper.
Tiles lipping: the wall was not flat enough for the tile size.
Damp appearing behind tiles in a shower: no tanking. Grout alone does not keep water out.
Grout cracking on a floor: movement in the substrate. It needs overboarding and a flexible adhesive.
Adhesive drying too fast: high suction. The surface needed priming.
New plaster
Plaster must be fully dry before tiling, which is around four weeks for a skim coat and longer in a cold or unventilated room.
It should be a uniform pale colour with no dark patches.
Do not use PVA as a primer under tiles. It re-emulsifies when the wet adhesive goes on and the tiles slide. Use an acrylic tile primer or SBR.
Removing old tiles first
Where old tiles are coming off, expect to make good the wall underneath.
Chip them off with a bolster and club hammer, working from a loose edge, wearing eye protection and gloves.
The plaster behind usually comes away in patches, so allow for filling, or re-skimming, before tiling again.
How long preparation takes
Stripping old tiles and making good a bathroom wall can take a full day.
Fixing and taping backer board takes half a day; tanking takes a few hours plus curing time.
None of it is visible in the finished job, and all of it determines whether the job lasts.
Build the drying and curing time into the plan rather than treating it as a delay.