A splashback is a manageable first tiling job. It is also entirely at eye level, so the setting out has to be right.
What you need
- Tiles, plus 10 per cent
- Adhesive: ready-mixed is acceptable here on a dry solid wall, and powdered is better
- Notched trowel, 6mm
- Spacers, 2 or 3mm
- Tile cutter and a tile file
- Tile trim if the edge will be exposed
- Spirit level, tape measure, pencil
- Grout and a grout float
- Sanitary silicone and a gun
- Sponges and buckets
Step 1: decide the height and extent
Common arrangements:
- Worktop to wall units, typically around 450 to 600mm. The usual choice
- A band of 200 to 300mm above the worktop, where there are no wall units
- Full height behind a hob, taken up to the extractor
- The whole wall, where the kitchen has an open run
Work to a whole number of tiles where you can, so the top row is uncut.
Behind a hob, check the tile is suitable for the heat and leave the clearance the hob manufacturer requires.
Step 2: prepare the wall
- Remove any old splashback and make good
- Wash the wall thoroughly. Kitchen walls carry cooking grease, which nothing sticks to
- Rinse and let it dry
- Sand painted walls to remove all sheen
- Fill and sand any hollows, since the wall must be flat
- Prime the surface and let it dry
Degreasing matters here more than in any other room.
Step 3: set out
The worktop is the reference for the bottom, unlike a wall where you use a batten.
- Check the worktop is level. It usually is, having been fitted
- If it is not, use a batten set to a level line instead and cut the bottom row
- Find the centre of the run, or the centre of the hob or sink, whichever the eye goes to
- Dry lay tiles with spacers to see where the cuts fall at each end
- Adjust so the end cuts are equal and reasonably wide
- Mark a plumb vertical starting line
Centre on the hob or the window rather than the wall where there is one, since that is what is looked at.
Step 4: allow a gap at the worktop
Do not sit the tiles hard down on the worktop.
Leave a 2 to 3mm gap, using spacers laid flat.
That joint is filled with silicone, not grout, because the worktop and the wall move independently.
Step 5: tile
- Comb adhesive onto the wall, half a square metre at a time
- Set the first tile on the starting line, resting on the spacers
- Press home with a twist
- Check with a level
- Work outwards and upwards, spacers in every joint
- Check level every two or three tiles
- Wipe adhesive off the faces as you go and rake it out of the joints
Step 6: sockets and switches
Kitchen splashbacks are full of them.
- Isolate the circuit at the consumer unit and confirm the socket is dead
- Loosen the faceplate screws and ease the plate forward
- Tile up to the back box, so the cut edges are hidden behind the faceplate
- Cut the tiles to fit around the box with 2 to 3mm clearance
- Check the faceplate still seats flat over the tile edges
- Longer screws may be needed to reach the back box through the tile thickness
- Restore the power only once everything is dry
Set out so a joint does not fall through the middle of a socket where you can avoid it.
Step 7: finish the edges
- Fit tile trim as you tile where an edge will be exposed
- Where the tiling runs into a wall unit or a window reveal, no trim is needed
- Keep factory edges outward and cut edges into corners
Step 8: grout and seal
Leave 24 hours, then grout.
Use an epoxy or a good quality flexible grout behind a hob or a sink, where it will be cleaned frequently.
Once cured, silicone the joint between the tiles and the worktop, and any internal corner.
Seal cement-based grout to resist cooking stains.
If it goes wrong
Tiles falling off: grease not removed from the wall.
Grout cracking along the worktop: that joint needed silicone.
Faceplate will not sit flat: tiles cut too close to the box, or screws too short.
Top row a narrow sliver: the height was not set to whole tiles.
Tiles not level along the run: the worktop was not level and no batten was used.
Behind a hob
The most demanding position in the kitchen.
- Check the hob manufacturer's required clearance to combustible and non-combustible surfaces
- Use a tile rated for the temperature; most ceramic and porcelain is fine, some decorative finishes are not
- Epoxy grout here resists grease and repeated cleaning far better than cement grout
- Take the tiling high enough that splashes land on tile, not paint
How long it takes
A typical splashback run takes a day to tile and an hour to grout the following day.
Allow extra for the sockets, which are slower than they look.
Alternatives to tiling
- Glass splashback: made to measure, no grout lines, easy to clean, and it must be measured precisely
- Stainless steel: behind a hob, durable and shows every mark
- Acrylic panels: cheap and light, and less heat resistant
Tiling remains the most repairable option, since a single damaged tile can be replaced.
Sealing to the worktop
Use a sanitary silicone in a colour that matches either the tile or the worktop.
Clean and dry the joint, mask both sides, apply one continuous bead, tool it off and remove the tape while wet.
Renew it when it discolours, which in a kitchen is every few years.