Tiling over existing tiles avoids the mess and damage of stripping. It works only when the existing tiles are firmly attached and the wall can carry the extra weight.

Step 1: test the existing tiles

Do this before deciding anything.

  1. Tap every tile with the handle of a screwdriver or your knuckle
  2. A solid, dull sound means the tile is well bedded
  3. A hollow, drummy sound means there is a void behind it
  4. Mark every hollow tile
  5. Try to lift the edge of any tile with a scraper
  6. Check the grout: crumbling grout suggests movement or damp

If more than a few tiles sound hollow, strip them all. A new tile fixed onto a loose one takes both off eventually.

When to strip instead

  • Any significant number of loose or hollow tiles
  • Damp or mould behind the tiles
  • An uneven or wavy existing surface
  • Existing tiles on plasterboard where the new weight would exceed the limit
  • A shower area with no tanking behind the existing tiles
  • Where the added thickness would cause problems at a window reveal, a door or a worktop

Weight and thickness

Two practical consequences.

Weight: the existing tiles, the new tiles and two beds of adhesive all hang on the wall. Add it up against the substrate limit: roughly 20kg per square metre for plaster and 32kg for plasterboard. Two layers of tile plus adhesive can easily exceed the plaster figure.

Thickness: you are adding roughly 15 to 20mm. That affects:

  • Window reveals and sills
  • Door frames and architraves
  • Sockets and switches, which may need longer screws or a spacer
  • The bath or shower tray edge, where the tile now overhangs
  • Skirting and door clearances on a floor

Check every junction before starting.

What you need

  • Silicon carbide abrasive or a diamond pad, or an angle grinder with a sanding disc
  • A tile primer suitable for non-porous surfaces
  • Flexible cement-based adhesive, S1 or S2
  • Sugar soap and a degreaser
  • Filler or adhesive for making good any removed tiles
  • P3 respirator and eye protection if sanding dry

Step 2: make good

  1. Remove any loose or hollow tiles
  2. Clean out the adhesive behind them
  3. Fill the recess flush with adhesive or a suitable filler
  4. Let it set and check it is flush with the surrounding tiles

Rake out and refill any badly damaged grout.

Step 3: clean thoroughly

Old tiles carry soap residue, cooking grease and cleaning product film.

  1. Wash with sugar soap or a degreaser
  2. Rinse with clean water
  3. Let it dry completely
  4. Run a hand over the surface: any slipperiness means residue remains

Step 4: key the glaze

Adhesive will not bond to a glazed surface as it is.

  • Abrade the whole surface with silicon carbide paper or a diamond pad until the shine has gone
  • An angle grinder with a sanding disc is faster on a large area, and very dusty. Wear a P3 respirator and eye protection
  • Concentrate on the areas where new tiles will sit
  • Vacuum and wipe down afterwards

Step 5: prime

Apply a primer designed for non-porous surfaces, sometimes sold as a tile-on-tile or grip primer.

Some contain fine aggregate to give the adhesive a mechanical key.

Let it dry fully as the tin directs.

Step 6: tile

  • Use a flexible S1 or S2 adhesive, without exception
  • Solid bed fixing: comb the wall and back-butter the tiles
  • Offset the new joints from the old ones where you can, so a new joint does not sit over an old one
  • Work in small areas and check level frequently
  • Use flexible grout to match

Floors

Tiling over floor tiles follows the same rules with more caution, since the added height affects doors, thresholds and appliance clearances under a worktop.

Measure the door clearance before starting.

If it goes wrong

New tiles coming away with old ones attached: the existing tiles were not sound. It all has to come off.

Tiles not bonding: the glaze was not keyed, or the surface was greasy.

Faceplates no longer fit: longer screws and a socket spacer are needed.

Cracks appearing over old joints: new joints aligned with old ones. Offset them.

Wall sounding hollow after tiling: the weight has exceeded what the substrate can hold. Stop and take advice.

When it is the right choice

  • Existing tiles firmly bedded on solid masonry
  • A flat existing surface
  • Dry area, or a wet area with sound tanking already behind
  • No thickness problem at reveals, frames or worktops
  • Comfortable margin on the weight limit

Stripping tiles instead

Where stripping is the right answer, expect it to be messy and damaging.

  1. Wear eye protection, gloves and a dust mask
  2. Start at a loose edge or break one tile out to make a start
  3. Work with a bolster and club hammer, keeping the bolster flat to the wall
  4. Expect the plaster to come away in patches
  5. Make good with bonding coat and skim, or have the wall re-plastered

Budget a full day for stripping and making good an average bathroom wall, and expect a great deal of dust and debris.

Checking the weight

Ask the supplier for the tile weight per square metre, or weigh one tile and calculate it.

Add around 5kg per square metre for adhesive and grout, then double the whole figure for two layers of tile.

Compare that against 20kg for plaster or 32kg for plasterboard before committing.

How long it takes

Cleaning, keying and priming existing tiles takes most of a day for a bathroom.

That is still considerably less than stripping, making good and waiting for new plaster to dry, which is the alternative.