An uninsulated suspended timber floor sits above a ventilated void connected to outside air. Insulating it makes a substantial difference to comfort, and it must not compromise the ventilation beneath.
Step 1: identify the floor
Suspended timber: floorboards on joists over a ventilated void. Sounds hollow, has air bricks in the wall below floor level, and the boards can be lifted.
Solid concrete: no void, no air bricks, does not sound hollow. Insulating it is a different and more disruptive job, usually done when the floor is being replaced.
This article covers suspended timber floors.
The rule that governs everything
The void beneath must remain ventilated.
- Air must cross from air bricks on one side of the house to the other
- Ventilation keeps the joists and boards dry
- Blocking it causes rot in the structural timbers
- It also disperses ground gases, including radon where relevant
- Walk round the outside and locate every air brick
- Clear soil, debris and vegetation from each
- Check none is rendered over, painted shut or buried by paving
- Fit periscope vents where ground level has risen
- Check none is blocked internally by the new insulation
Step 2: choose the approach
From below, where there is a cellar or a crawl space with access.
- Far less disruptive: no floor covering to lift
- Cramped, dirty work
- Only possible with adequate headroom and access
From above, lifting the floorboards.
- The usual method in a normal house
- Disruptive: the room must be cleared and the floor covering removed
- Best done when a room is being redecorated or recarpeted anyway
- Gives an opportunity to inspect the joists, wiring and pipework
What you need
- Mineral wool insulation, or rigid boards
- Breathable netting or a supporting membrane
- A staple gun and staples, or battens
- A bolster, a pry bar and a nail punch
- A floorboard saw or a multi-tool
- Screws for refixing boards
- A knife and a straight edge
- Gloves, long sleeves, eye protection and an FFP3 mask
- A torch and a work light
- Pipe lagging
Step 3: prepare
- Clear the room completely
- Lift the floor covering
- Check for cables and pipes before cutting or lifting anything
- Isolate the electrical circuits serving the room
- Note where the joists run
- Photograph the layout of services as you expose them
Step 4: lift the boards
- Start with a board at the edge, or one already cut
- Use a bolster to lever it up gently, working along its length
- Punch nails through rather than levering hard against neighbouring boards
- Number the boards as you lift them so they go back in order
- Where boards are tongue and groove, the tongue must be cut with a multi-tool or a circular saw set to board depth
- Set the boards aside carefully; old boards split easily
Step 5: inspect while it is open
A rare opportunity.
- Probe the joists and the wall plates with a bradawl for rot
- Check the joist ends where they enter the wall, which is where rot occurs
- Look for woodworm
- Check for damp, standing water or poor drainage in the void
- Check pipework for leaks and lag it while you can reach it
- Check cables are sound and not damaged
- Clear debris and builders' rubble from the void, which obstructs airflow
Deal with any rot or damp before insulating. Covering it makes it worse and hides it.
Step 6: fit the support
The insulation needs holding up between the joists.
- Cut breathable netting to run across the joists
- Staple it to the side of one joist, drape it into the bay, and staple to the next
- Leave enough slack for the insulation to sit in without compressing
- Work along the room bay by bay
- Alternatively fix timber battens along the joist sides to carry rigid boards
Use a breathable netting or membrane. A vapour-impermeable sheet on the cold side traps moisture in the insulation and the joists.
Step 7: fit the insulation
- Cut mineral wool slightly wider than the bay so it fits snugly with no gaps at the edges
- Gaps at the edges destroy the performance, so fit it carefully against the joists
- Do not compress it
- Fill the full depth of the joist where possible
- Where using rigid boards, cut accurately and seal the edges with tape or foam
- Work around pipes and cables carefully, and do not bury cables in insulation where it can be avoided
- Insulate right to the perimeter, without blocking the airflow across the void
Step 8: relay the boards
- Refit the boards in their numbered order
- Screw rather than nail them, which stops squeaking and allows future access
- Countersink the screws
- Close up any gaps between boards as you go
- Seal the perimeter gap at the skirting afterwards
Step 9: finish the job
- Seal around every pipe penetration
- Caulk the skirting to floor joint
- Fill or strip-seal any remaining board gaps
- Go outside and confirm every air brick is clear
- Check the void has not been obstructed at the perimeter
Safety
- Mineral wool irritates skin, eyes and airways. Cover up and wear an FFP3 mask
- Ventilate the room while working
- Wash separately afterwards
- Watch for old wiring, nails and sharp debris
- Take care with joists: do not cut or notch them without advice, since they are structural
- Any suspicion of asbestos in old material under the floor: stop and get it tested
If it goes wrong
Floor squeaks after relaying: screw the boards down rather than nailing.
Damp or musty smell afterwards: the ventilation may be obstructed. Check the air bricks and the void perimeter.
Boards split on lifting: common with old boards. Replacements can be matched from a reclamation yard.
Insulation sagging: the netting was too slack or badly fixed.
Cold spots remain: gaps at the edges of the insulation. It must fit tight to the joists.
A summary
- The void beneath must stay ventilated; clear every air brick first
- Work from below where there is access, or lift the boards from above
- Inspect and deal with rot, damp and pipework while the floor is open
- Use breathable netting, never a vapour-impermeable sheet on the cold side
- Fit the insulation tight to the joists, with no gaps at the edges
- Screw the boards back rather than nailing them