Back to Repairs

Choosing a Roofer

Choosing a Roofer
DIY Guides Editorial 15 April 2026

Roofing has a particular problem: the customer cannot see the roof, cannot inspect the work, and cannot easily judge whether what they were told was true. That attracts both good tradespeople and bad ones.

The doorstep approach

Someone calling unannounced to say they have noticed a problem with your roof is the single biggest warning sign in this trade.

How it typically runs:

  • They are working nearby and happened to notice slipped tiles or cracked mortar
  • They offer to take a look, free of charge
  • They come down with photographs of alarming damage, which may or may not be your roof
  • The price starts high and drops if you agree today
  • Payment is wanted up front, or in cash
  • The work expands once started, with more problems discovered
  • The guarantee is a printed sheet from a company that cannot be traced afterwards

Never agree to roof work from an unsolicited caller. Never let anyone go up on your roof to look without an agreed arrangement.

Reputable roofers are busy and do not need to knock on doors.

Step 1: know what you are buying

Before getting quotes, do your own inspection from the ground and in the loft, and photograph what you find. Being able to describe the problem changes the conversation entirely.

Understand roughly what the repair involves, so you can ask sensible questions.

Step 2: find candidates

  • Personal recommendation from someone who has had work done and can show you
  • A local firm with a fixed business address and a landline
  • Trade association membership, which can be verified on the association's own website
  • Local trade review sites, reading the detail rather than the score
  • Ask a local builder or a surveyor who they use

Verify any claimed membership directly with the organisation, not from a logo on a leaflet.

Step 3: get three quotes

  1. Get at least three written quotes for the same work
  2. Show each of them the same information
  3. Ask each to inspect properly and report what they find
  4. Ask for photographs of the defects they identify
  5. Compare what is being done, not just the price

Where quotes differ wildly, they are usually for different work. One may be repointing where another is rebedding, or patching where another is recovering.

Step 4: what a good quote contains

  • A clear description of the defect and its cause
  • A clear description of the work, with materials specified
  • Access arrangements: ladder, tower or scaffold, and who provides it
  • Whether scaffolding is included or extra
  • Materials: tile type, lead code, membrane, mortar mix or dry fix system
  • How waste will be removed
  • A start date and a duration
  • The total price, with VAT stated
  • Payment terms
  • The guarantee and its terms

A one-line quote for a lump sum tells you nothing. Ask for detail.

Step 5: check the credentials

  1. Ask for public liability insurance and check the certificate is current
  2. Ask whether they have employer's liability insurance if they have staff
  3. Ask for two references for similar recent work, and follow them up
  4. Ask to see photographs of previous jobs
  5. Check the company details: a registered company can be looked up
  6. Check how long they have traded
  7. Confirm who will actually do the work

Step 6: payment

  • Never pay the full amount in advance
  • A deposit for materials on a large job is reasonable; a large deposit for a small repair is not
  • Stage payments against completed work on a larger job
  • Pay by card or bank transfer, which leaves a record
  • Paying by credit card may give additional protection on qualifying transactions
  • Be cautious of a request for cash
  • Retain a final payment until you are satisfied

Step 7: during the work

  • Ask for photographs at each stage, particularly of anything that will be covered up
  • Ask to see the defect before it is repaired
  • Do not accept additional work being added without a written price
  • Where more problems are found, ask for photographs and a written quote before agreeing
  • Keep a record of what was agreed and when

Step 8: guarantees

  • Get the guarantee in writing, with its duration and what it covers
  • A guarantee is only as good as the company standing behind it
  • Ask whether it is insurance backed, which protects you if the company ceases trading
  • Read what is excluded, which is frequently more informative
  • Check whether it transfers on sale of the property
  • Keep it with the house papers

Building Regulations

  • Replacing more than a set proportion of a roof covering is notifiable, and may require thermal upgrading
  • Structural alterations are notifiable
  • A competent roofer will raise this; ask if they do not
  • Get the certificate and keep it, since it will be asked for on sale

Warning signs

  • Unsolicited approach
  • Pressure to decide today, or a price that drops if you agree now
  • Cash only, or a large payment up front
  • No written quote, or a vague one
  • No fixed address, mobile number only
  • Alarming photographs after an unrequested inspection
  • Reluctance to give references
  • Work expanding significantly once started
  • Claims that the whole roof needs replacing after a brief look

If it goes wrong

Pressured on the doorstep: decline and close the door. You are under no obligation.

Work started and price increasing: stop and ask for a written quote for the additional work.

Work not done properly: put your complaint in writing, keep photographs, and take advice on your rights.

Company untraceable afterwards: report it, and check whether the guarantee was insurance backed.

Unsure whether the work is needed: pay a surveyor for an independent opinion before committing.

A summary

  1. An unsolicited caller reporting a roof problem is the biggest warning sign in the trade
  2. Inspect and photograph the problem yourself before getting quotes
  3. Get three written quotes and compare the work, not just the price
  4. Check public liability insurance and follow up two references
  5. Never pay in full up front, and keep a record of payment
  6. Get the guarantee in writing and ask whether it is insurance backed