Replacing plastic guttering is well within reach for a single-storey run. The work is in setting it out accurately, not in the fitting.
Safety
All the working at height rules apply: standoff bracket, 4 to 1, tied or footed, no overreaching, and a tower for anything sustained.
Above single-storey height, get a contractor with proper access.
Step 1: identify the profile
Gutter profiles are not interchangeable between manufacturers, and sometimes not within a range.
Common UK profiles:
- Half round: the traditional semicircular section, in 112mm and 150mm
- Square: a squared section, 114mm
- Ogee or Deepflow: a decorative or high-capacity profile, popular on newer housing
- Round downpipes: 68mm typically
- Square downpipes: 65mm typically
Take an offcut to the merchant, or photograph the profile end-on with a tape measure alongside. Mixing brands rarely works.
Step 2: work out the sizes
- Larger roof areas need larger gutters and downpipes
- A gutter that overflows in heavy rain may be undersized rather than blocked
- Deepflow or high-capacity profiles handle more water in the same visual width
- One downpipe typically serves a limited length of gutter; a long run may need two
- Ask the merchant to check the capacity against your roof area
What you need
- Gutter lengths, unions, stop ends, angles, outlets and brackets
- Downpipe, brackets, offsets or a swan neck, and a shoe
- Stainless or coated screws
- A drill driver, and a masonry drill for downpipe brackets
- A fine tooth saw, and a file
- A string line, a level and a tape measure
- A ladder with a standoff, or a tower
- Gloves and eye protection
Step 3: remove the old
- Start at one end and work along
- Release the unions and lift each length out
- Lower everything to the ground rather than dropping it
- Remove the old brackets
- Inspect the fascia thoroughly once it is exposed. Rot behind a gutter is very common and must be repaired before the new gutter goes on
- Repair or replace any damaged fascia now, since it is far harder later
Step 4: set the fall
The step that determines whether it works.
- Decide the outlet position, usually at an existing downpipe
- Fix the bracket at the highest point first, at the far end of the run
- Set the height so the gutter sits below the roof line, with the tile overhanging into it. A common guide is that a straight edge laid down the roof slope should just clear the front edge of the gutter
- Fix a bracket at the outlet end, lower by the required fall
- Fall of roughly 3mm per metre, or as the manufacturer states
- Run a taut string line between the two brackets
- Fix all the intermediate brackets to the string line
Too little fall and water stands; too much and it looks wrong and can overshoot the outlet in heavy rain.
Step 5: bracket spacing
- Around 800mm to 1m centres, or as the manufacturer specifies
- A bracket within 150mm each side of every joint, angle and outlet
- Closer spacing in areas subject to snow load
- Fix into sound timber, with the screw fully home
- Where there is no fascia, rafter brackets or rise-and-fall brackets are used
Step 6: fit the gutter
- Cut lengths with a fine tooth saw, squarely
- File the cut edge smooth and remove the burr, or it will not seat in the union
- Clip the gutter into the brackets, back edge first then front
- Fit unions, angles and stop ends
- Leave the expansion gap indicated by the moulded marks inside each union. This is not optional
- Check the seals are seated in the unions before assembling
- Work along the run to the outlet
Expansion is real and significant. A long run of plastic gutter fitted hard will buckle in summer heat and pull its joints open in winter.
Step 7: the downpipe
- Fit the outlet in the gutter above the intended downpipe position
- Where the downpipe must move inward to the wall, use an offset or swan neck: two bends and a short connecting piece
- Drop a plumb line from the outlet to establish the vertical
- Fix brackets at roughly 1.8m to 2m centres, and always at every joint and at the top and bottom
- Drill and plug into the masonry, into a brick rather than a joint where possible
- Assemble the pipe into the sockets, again leaving the expansion gap
- Fit a shoe at the bottom, directing water into the gully
- Check the shoe discharges into the gully, not onto the ground
Step 8: test it
- Run a hose into the gutter at the highest point
- Watch the water run the full length and down the outlet
- Check for standing water
- Check every joint for drips
- Check the downpipe discharges properly
- Check again during the next heavy rain
If it goes wrong
Water stands in the gutter: insufficient fall, or a bracket set too low.
Joints pulling apart in winter: the expansion gap was left too large, or the run is unsupported.
Gutter buckling in summer: no expansion gap left.
Water running behind the gutter: it is set too low, or the felt does not overhang into it.
New gutter does not fit the old fittings: different manufacturer. Match the profile exactly.
A summary
- Take an offcut to the merchant; profiles are not interchangeable
- Inspect and repair the fascia while the gutter is off
- Set the fall with a string line, roughly 3mm per metre
- Brackets at 800mm to 1m centres, and each side of every joint
- Leave the expansion gap indicated in every union and socket
- Test with a hose before you take the ladder down